HyreElectrical

Original research · Licensing

Who Actually Issues an Electrician Licence, in All 50 States and DC

“Licensed electrician” is not one thing. In 35 jurisdictions the state licenses the person holding the tools. In 11 it licenses only the company. In five it licenses nothing at all and the rule is set by a city. We coded every jurisdiction on that one axis and published which cells we re-verified and which we did not.

Updated September 6, 2026 · Data as of 6 September 2026

Written by HyreElectrical Research Desk Primary-source research and fact checking

35 jurisdictions license the individual electrician at state level
11 jurisdictions license only the contracting business
5 jurisdictions issue no state electrical licence at all
12/51 rows re-verified the rest are labelled, not filled in

The finding

Of 51 jurisdictions, 35 license the individual electrician at state level, 11 license only the contracting business, and 5 issue no state electrical licence of any kind — Illinois, Indiana, Kansas, New York and Pennsylvania. That last group is the list every licensing blog repeats, and it is repeated with two errors. Missouri does not belong on it: RSMo 324.900–324.945 creates a statewide electrical contractor licence, and §324.925 requires every political subdivision to recognise it in lieu of a local licence. And Kansas is not about to leave it: the statewide licensing bill widely reported as taking effect on 1 July 2027, HB 2588, died in the 2025–26 session. Coverage, stated before you use any cell: 12 of the 51 rows were re-verified this pass against the issuing authority’s own page, statute or legislature record. 38 carry the desk’s board register of 5 September 2026 and were not re-verified at statute level. 1 — Indiana — is published UNVERIFIED because its licensing agency refused connections from our host. The status column in the table says which is which for every row.

Read this before you use any cell in the table

The licence-by-state page publishes a 51-row matrix, and a 51-row matrix is exactly the shape of document that gets copied without checking. So the verification status is a column in the table rather than a line in the method, and it is stated here first.

12 rows were re-verified on 6 September 2026 against the issuing authority’s own page, the state’s own statute, or the legislature’s own bill record: California, Florida, Illinois, Kansas, Minnesota, Missouri, New York, Pennsylvania, Texas, Utah, Virginia and Washington. Every one of those is cited individually below with the document it came from.

38 rows carry the board of record from this desk’s licence register, retrieved 5 September 2026, and were not re-opened at statute level on this pass. They are good enough to tell you which authority to ask. They are not good enough to quote as a legal statement about that state’s classes or hour thresholds, and this page does not quote them that way.

Indiana is UNVERIFIED. www.in.gov refused the connection from our retrieval host on both attempts. Secondary sources agree that Indiana licenses electricians municipally, and we have not published that as verified, because agreement between secondary sources is the failure mode this page exists to correct.

Nothing here rests on this site’s own contractor records. That store is five states — Florida, Utah, Nevada, California and Texas — and 74 per cent of it is Florida. It is not a national sample and it is not evidence about licensing law. This study is built on state licensing authorities, statutes and legislature records only.

Why “who issues it” is the axis that matters

“Are they licensed?” has a different answer in almost every state, and the difference is not strictness. It is what the licence is attached to. Most states examine and license a person, who carries a journeyman or master card you can look up by name. A second group licenses only the company — the entity that bids, pulls the permit and carries the insurance — leaving the individual’s credential to the county. A third group issues no state electrical licence at all, and the only credential is the one a city created.

HYRE analysis. This is why cross-state licensing content goes wrong so reliably. A guide listing “journeyman: 8,000 hours” for forty states and “no state licence” for five has changed what it measures halfway down the table — a person’s credential in most rows, the absence of a programme in the rest — while the middle category collapses into whichever side reads closer. 11 of 51 jurisdictions sit in that middle. It is not a rounding error.

What the tier is not. A tier-1 jurisdiction is not unregulated. Chicago, New York City and Philadelphia run some of the oldest and most demanding electrical licensing programmes in the country. The tier records where authority sits, not how hard the exam is.

The three tiers, defined

Who issues the electrician licence, by jurisdictionAK3ME3VT3NH3WA3ID3MT3ND3MN3IL1WI3MI3NY1RI3MA3OR3NV2WY3SD3IA3IN1OH2PA1NJ3CT3CA3UT3CO3NE3MO2KY3WV3VA3MD3DE3AZ2NM3KS1AR3TN2NC2SC2DC3OK3LA2MS2AL3GA2HI3TX3FL23 = state licenses the individual · 2 = state licenses the business only · 1 = no state licence0<11223Tier, not a rating. A tier-1 state is not unregulated; its rules are municipal. Coding by HyreElectrical ResearchDesk from state licensing authorities, 6 September 2026.
Every jurisdiction coded on one axis: who issues the licence. The number in each tile is the tier, not a score. HyreElectrical Research Desk, from state licensing authorities. 6 September 2026.
Tier 3 — the state licenses the individual (35 jurisdictions)
There is a state-issued credential with the electrician’s name on it: journeyman, journeyworker, master, certificate of fitness, or a numbered certificate of competency. You can search a person. Most of these states also license the contracting business separately, and the two are not interchangeable.
Tier 2 — the state licenses the business only (11 jurisdictions)
Arizona, Florida, Georgia, Louisiana, Mississippi, Missouri, Nevada, North Carolina, Ohio, South Carolina and Tennessee. The state examines and licenses the contracting entity, or its qualifying agent. Whether the individual doing the work needs a card is a county or city question. Searching the state register here tells you about the company, and nothing about the person in your house.
Tier 1 — no state licence (5 jurisdictions)
Illinois, Indiana, Kansas, New York and Pennsylvania. The state issues no electrical licence of any kind. Licensing exists, but it is municipal, and a licence from one city carries no weight in the next. A clean result from a state licence lookup in these five states is not a clean result — it is a search of the wrong register.

How the 51 jurisdictions divide

The 51 jurisdictions split by issuing authority68.6%State licenses the individual electrician — 35 jurisdictions21.6%State licenses the contracting business only — 11 jurisdictions9.8%No state licence — county or municipal — 5 jurisdictionsSame coding as the tile map above. n = 51 (50 states and DC).
The same coding as the tile map, as a share of all 51 jurisdictions. HyreElectrical Research Desk. 6 September 2026.

HyreElectrical calculation. Coding all 51 jurisdictions on the issuing axis gives 35 tier-3, 11 tier-2 and 5 tier-1. Put another way: in roughly one jurisdiction in three, asking the state whether your electrician is licensed cannot return a useful answer about the individual, either because the state licenses only companies or because it licenses nothing.

That is the practical output of this study, and it is the reason the public verification URL is a column in the table rather than a link at the bottom of the page.

Two companion studies read the same licensing landscape differently: the electrician concentration index ranks states on employment data rather than on who issues the credential, and Florida’s licence classes takes the deepest tier-1 jurisdiction apart class by class.

Two corrections to the list everyone repeats

The commonly circulated set of “states with no electrician licence” is Illinois, Pennsylvania, Missouri, New York and Kansas. Two of those five are wrong, in opposite directions, and both errors are checkable in an afternoon against the state’s own text.

Missouri does have a statewide licence — and locals must honour it

Source fact. Missouri Revised Statutes §§324.900–324.945 create a statewide electrical contractor licence, administered by the Division of Professional Registration’s Office of Statewide Electrical Contractors. §324.925 is titled “Political subdivisions to recognize statewide licensure” and provides that political subdivisions “shall not be prohibited from establishing their own local electrical contractor’s license, but shall recognize a statewide license in lieu of a local license for the purposes of performing contracting work or obtaining permits to perform work within such political subdivision.” A subdivision that refuses has local sales-tax distributions withheld until it complies.

Source fact. §324.920 sets the qualification: 12,000 verifiable practical hours installing equipment; or 10,000 hours with a journeyman certificate from a US Department of Labor–approved apprenticeship; or 8,000 hours with a relevant associate degree; or 4,000 hours supervising installation with a four-year electrical engineering degree. A nationally accredited third-party examination, $500,000 of liability insurance, and a bond with each political subdivision that requires one.

HYRE analysis. Missouri is a tier-2 state, not a tier-1 state. The received claim is not baseless — Missouri issues no statewide journeyman or master electrician licence, and §324.900 exempts a contractor from needing the statewide licence in a subdivision that requires no local one — but “Missouri has no state electrical licence” is false, and it sends a homeowner to the wrong register. The right register is the Division of Professional Registration.

Kansas is not becoming a statewide-licence state in 2027

Source fact. Kansas HB 2588, short title “Providing for statewide electrician licensing by the state fire marshal,” was heard in the House Committee on Commerce, Labor and Economic Development on 5 February 2026 and reported favourably as amended on 17 February; the Senate Committee on Commerce heard it on 12 March and reported it favourably as amended on 18 March. The legislature’s own bill record shows it never reached enrollment and never reached the Governor. Its status is “Died.”

HYRE analysis. The 1 July 2027 effective date was in the bill, which is how it escaped into circulation as a fact — including into this site’s own licence register, which we are correcting rather than quietly overwriting. Kansas electrician licensing remains municipal today, and no enacted law changes that. If the bill is reintroduced in a later session the position could change; a bill that died in committee report is not a scheduled reform.

Recommendation. If you are hiring in Kansas, the licence that governs the work is the one issued by the city or county that will issue the permit — for much of the state that is Wichita/Sedgwick County or the local jurisdiction, not any state office. Ask the permitting office which credential it accepts before you sign.

All 50 states and DC: who issues, and where to check

The status column is the honest part. Do not treat a “board register” row as a legal statement about that state’s licence classes — treat it as the correct authority to ask.

JurisdictionIssuing authority of recordTierPublic verificationStatus
AlabamaAlabama Electrical Contractors BoardState · individualaecb.alabama.govBoard register 5 September 2026
AlaskaAlaska Department of Labor and Workforce Development, Mechanical InspectionState · individuallabor.alaska.gov/lss/plumbing_electrical.htmBoard register 5 September 2026
ArizonaArizona Registrar of ContractorsState · business onlyroc.az.govBoard register 5 September 2026
ArkansasArkansas Department of Labor and Licensing, Board of Electrical ExaminersState · individualwww.labor.arkansas.gov/licensing/board-of-electrical-examinersBoard register 5 September 2026
CaliforniaContractors State License Board (C-10 Electrical) and DIR Electrician Certification UnitState · individualwww.cslb.ca.gov/OnlineServices/CheckLicenseII/CheckLicense.aspxRe-verified 6 September 2026
ColoradoColorado Department of Regulatory Agencies, Electrical BoardState · individualapps.colorado.gov/dora/licensing/Lookup/LicenseLookup.aspxBoard register 5 September 2026
ConnecticutConnecticut Department of Consumer Protection, Electrical WorkState · individualwww.elicense.ct.govBoard register 5 September 2026
DelawareDelaware Division of Professional Regulation, Board of Electrical ExaminersState · individualdelpros.delaware.gov/OH_VerifyLicenseBoard register 5 September 2026
District of ColumbiaDC Department of Licensing and Consumer Protection, Board of Industrial TradesState · individualdlcp.dc.gov/service/online-resources-0Board register 5 September 2026
FloridaFlorida Department of Business and Professional Regulation, Electrical Contractors’ Licensing BoardState · business onlywww.myfloridalicense.com/wl11.aspRe-verified 6 September 2026
GeorgiaGeorgia Secretary of State, Construction Industry Licensing Board, Division of Electrical ContractorsState · business onlyverify.sos.ga.govBoard register 5 September 2026
HawaiiHawaii Department of Commerce and Consumer Affairs, Board of Electricians and PlumbersState · individualpvl.ehawaii.gov/pvlsearchBoard register 5 September 2026
IdahoIdaho Division of Occupational and Professional Licenses, Idaho Electrical BoardState · individualdopl.idaho.govBoard register 5 September 2026
IllinoisNo statewide electrical board — municipal licensingLocal onlyidfpr.illinois.govRe-verified 6 September 2026
IndianaNo statewide electrical board — municipal licensingLocal onlywww.in.gov/dhs/fire-and-building-safetyUNVERIFIED — site unreachable
IowaIowa Department of Inspections, Appeals, and Licensing, Electrical Examining BoardState · individualdial.iowa.gov/licensesBoard register 5 September 2026
KansasNo statewide electrical licence — county and municipal licensing (corrected — see below)Local onlyfiremarshal.ks.govRe-verified 6 September 2026
KentuckyKentucky Department of Housing, Buildings and Construction, Electrical DivisionState · individualdhbc.ky.govBoard register 5 September 2026
LouisianaLouisiana State Licensing Board for Contractors (electrical classification)State · business onlywww.lslbc.louisiana.govBoard register 5 September 2026
MaineMaine Department of Professional and Financial Regulation, Electricians’ Examining BoardState · individualwww.pfr.maine.gov/almsonline/almsquery/SearchIndividual.aspxBoard register 5 September 2026
MarylandMaryland Department of Labor, State Board of ElectriciansState · individualwww.labor.maryland.gov/license/elecBoard register 5 September 2026
MassachusettsMassachusetts Division of Occupational Licensure, Board of State Examiners of ElectriciansState · individualwww.mass.gov/orgs/board-of-state-examiners-of-electriciansBoard register 5 September 2026
MichiganMichigan Department of Licensing and Regulatory Affairs, Bureau of Construction Codes, Electrical DivisionState · individualwww.michigan.gov/lara/i-need-to/find-or-verify-a-licensed-professional-or-businessBoard register 5 September 2026
MinnesotaMinnesota Department of Labor and Industry, Electrical LicensingState · individualwww.dli.mn.gov/license-and-registration-lookupRe-verified 6 September 2026
MississippiMississippi State Board of ContractorsState · business onlywww.msboc.usBoard register 5 September 2026
MissouriDivision of Professional Registration, Office of Statewide Electrical Contractors (corrected — see below)State · business onlypr.mo.govRe-verified 6 September 2026
MontanaMontana Department of Labor and Industry, State Electrical BoardState · individualebiz.mt.gov/polBoard register 5 September 2026
NebraskaNebraska State Electrical DivisionState · individualelectrical.nebraska.govBoard register 5 September 2026
NevadaNevada State Contractors Board (classification C-2 Electrical)State · business onlyapp.nvcontractorsboard.com/Clients/NVSCB/Public/ContractorLicenseSearch/ContractorLicenseSearch.aspxBoard register 5 September 2026
New HampshireNew Hampshire Office of Professional Licensure and Certification, Electricians’ BoardState · individualforms.nh.gov/licenseverificationBoard register 5 September 2026
New JerseyNew Jersey Division of Consumer Affairs, Board of Examiners of Electrical ContractorsState · individualwww.njconsumeraffairs.gov/elecBoard register 5 September 2026
New MexicoNew Mexico Regulation and Licensing Department, Construction Industries Division, Electrical BureauState · individualwww.rld.nm.gov/construction-industries/find-a-bureau/bureaus/electrical-bureauBoard register 5 September 2026
New YorkNo statewide electrical board — municipal licensing (NYC Department of Buildings is the largest program)Local onlywww.nyc.gov/site/buildings/industry/licensing.pageRe-verified 6 September 2026
North CarolinaNorth Carolina Board of Examiners of Electrical ContractorsState · business onlywww.ncbeec.orgBoard register 5 September 2026
North DakotaNorth Dakota State Electrical BoardState · individualwww.ndseb.comBoard register 5 September 2026
OhioOhio Construction Industry Licensing Board (electrical contractor)State · business onlyelicense.ohio.gov/oh_verifylicenseBoard register 5 September 2026
OklahomaOklahoma Construction Industries Board, ElectricalState · individualoklahoma.gov/cib.htmlBoard register 5 September 2026
OregonOregon Building Codes Division, Electrical and Elevator BoardState · individualwww.oregon.gov/bcd/licensing/Pages/index.aspxBoard register 5 September 2026
PennsylvaniaNo statewide electrician license — municipal licensing; Home Improvement Contractor registration is a separate consumer-protection fileLocal onlywww.attorneygeneral.gov/protect-yourself/home-improvement-consumer-protection-actRe-verified 6 September 2026
Rhode IslandRhode Island Department of Labor and Training, Division of Professional Regulation (Electricians)State · individualdlt.ri.gov/regulation-and-safety/professional-regulation/electriciansBoard register 5 September 2026
South CarolinaSouth Carolina LLR, Contractors’ Licensing Board (electrical)State · business onlyllr.sc.gov/clbBoard register 5 September 2026
South DakotaSouth Dakota Electrical Commission, Department of Labor and RegulationState · individualdlr.sd.gov/electricalBoard register 5 September 2026
TennesseeTennessee Board for Licensing Contractors (electrical contractor and Limited Licensed Electrician)State · business onlyverify.tn.govBoard register 5 September 2026
TexasTexas Department of Licensing and Regulation, ElectriciansState · individualwww.tdlr.texas.gov/LicenseSearchRe-verified 6 September 2026
UtahUtah Division of Professional Licensing, Electricians and Plumbers Licensing BoardState · individualsecure.utah.gov/llv/search/index.htmlRe-verified 6 September 2026
VermontVermont Department of Public Safety, Division of Fire Safety, Electricians’ Licensing BoardState · individualfiresafety.vermont.gov/licensingBoard register 5 September 2026
VirginiaVirginia Department of Professional and Occupational Regulation, Board for Contractors (tradesman electrician and contractor)State · individualwww.dpor.virginia.gov/LicenseLookupRe-verified 6 September 2026
WashingtonWashington State Department of Labor & Industries, Electrical ProgramState · individualsecure.lni.wa.gov/verifyRe-verified 6 September 2026
West VirginiaWest Virginia State Fire Marshal, Electrical LicensingState · individualfiremarshal.wv.govBoard register 5 September 2026
WisconsinWisconsin Department of Safety and Professional Services (electricians)State · individuallicensesearch.wi.govBoard register 5 September 2026
WyomingWyoming Department of Fire Prevention and Electrical SafetyState · individualwsfm.wyo.gov/electrical-safetyBoard register 5 September 2026

Lookup URLs are those recorded in this desk’s licence register on 5 September 2026. The 12 re-verified rows had their authority re-opened on 6 September 2026; the remaining URLs were not re-tested on this pass and a state agency can move a page without notice. Where a link 404s, search the agency name, not the URL.

The verified subset: what each state actually issues, and on what threshold

Eight of the 12 re-verified jurisdictions publish enough detail to compare directly. The comparison is the point: these columns do not share a unit.

StateWhat the state issuesEntry-grade thresholdSenior gradeSeparate business licence?
TexasApprentice, residential wireman, journeyman, master, master sign; plus a separate electrical contractor licence8,000 h for licensure (may sit the exam at 7,000 h)Master: 12,000 h and two years holding a journeyman licenceYes — work must be performed through a licensed electrical contractor
CaliforniaGeneral electrician, residential, fire/life safety, voice-data-video, non-residential lighting (DIR); C-10 contractor (CSLB)8,000 h across two or more of nine work categories, each cappedNo state master grade; the C-10 contractor licence is the senior credentialYes — CSLB C-10, a separate licence from the individual certification
Washington01 general journey level, 02 residential, master certificates, and 14 numbered specialties8,000 h plus 96 h classroom for the 01; specialties 4,000 h or 2,000 hMaster certificate; cannot be obtained by reciprocityYes — electrical contractor licence, bond and insurance filed with L&I
UtahApprentice, residential journeyman, journeyman, residential master, master; plus contractor8,000 h plus 576 h classroom (four years at 144 h), or 16,000 h with no classroomMaster: 8,000 h as a licensed journeyman, or 4,000 h with an applied-science degreeYes — a DOPL contractor classification covering electrical work
MinnesotaRegistered unlicensed electrician, journeyworker, master; plus electrical contractorExam plus documented experience; DLI does not publish a single hour figure on the licensing-basics pageMaster: one year as a journeyworker, or five years in electrical planning and installation, or an engineering degreeYes — electrical contractor licence
VirginiaTradesman journeyman and master (individual); Class A/B/C contractor with an electrical specialty (business)Four years practical plus 240 h vocational training — sliding to seven years plus 40 hMaster: one year as a licensed journeyman, or ten years verified practical experienceYes — and a tradesman card alone does not let you contract
FloridaCertified electrical contractor (statewide) and registered electrical contractor (local scope). No statewide journeyman licence.No individual electrician licence exists at state levelCertified EC: three years proven management experience in the trade, or four years as supervisor or contractor, or six years comprehensive trainingThe business licence is the licence
MissouriStatewide electrical contractor licence (business). No statewide journeyman or master licence.No individual electrician licence exists at state levelContractor: 12,000 verifiable practical hours, or 10,000 h with a DOL-approved journeyman certificate, or 8,000 h with an associate degree, or 4,000 h supervising with an electrical engineering degreeYes — plus $500,000 liability insurance and a bond with each political subdivision that requires one

Every figure in this table was read on 6 September 2026 from the document cited for that state in Sources below. Illinois, Kansas, New York and Pennsylvania are absent because there is no state threshold to record.

The thresholds are not measured in the same thing

Source fact. Texas requires 8,000 hours of on-the-job training under a Texas-licensed master electrician for a journeyman licence, and lets an applicant sit the examination at 7,000 hours. Utah requires 8,000 hours as a licensed apprentice plus 576 hours of classroom study across four years — or 16,000 hours with no classroom at all. Washington requires 8,000 hours plus 96 hours of basic classroom instruction for the 01 general journey level. California requires 8,000 hours spread across at least two of nine defined work categories, each with its own cap: no more than 3,000 hours of residential wiring, no more than 1,500 of troubleshooting, no more than 300 of stock-room work.

Source fact. Virginia does not count hours at all. Its journeyman tradesman licence takes four years of practical experience plus 240 hours of formal vocational training — or five years plus 160 hours, or six plus 80, or seven plus 40, or ten years of observed practical experience with no classroom. Its master tradesman licence takes one year as a licensed journeyman.

Source fact. Florida counts neither. Its certified electrical contractor licence, under Fla. Stat. §489.511, takes three years of proven management experience in the trade within the preceding six years, or four years as a supervisor or contractor within eight, or six years of comprehensive training within twelve — plus the certification examination and good moral character.

HYRE analysis. Four numbers that all read as “8,000 hours” describe four different obligations, because one is bare supervised time, one carries a 576-hour classroom debt, one carries 96, and one is capped category by category so that 8,000 hours of the wrong kind of work does not qualify. Virginia’s four years and Florida’s three are not smaller versions of the same requirement; they are a different quantity. Any table that ranks states by “hours required” is comparing incommensurable units, and the ranking it produces means nothing. That is why the table above reports what each state measures rather than converting everything to one column.

HYRE analysis. Florida is the sharpest case and it is worth naming plainly. The Florida credential is a management qualification for the person who will qualify a business, not a tools qualification for the person who will do the work. That is a coherent regulatory design — it puts responsibility on the entity that carries the insurance and pulls the permit — but it means the sentence “Florida requires three years’ experience to be a licensed electrician” is wrong twice over.

Reciprocity is bilateral, narrow, and structurally impossible in five states

Reciprocity is usually described in the abstract. It is administered on a form, and the form lists the states. Two of those forms, read in full:

StatePartnersWhich states, at which gradeConditions
Minnesota9AK (journeyman only); AR (journeyman only); CO (journeyman only); IA (master and journeyman); MT (journeyman only); NE (master and journeyman); ND (master and journeyman); SD (master and journeyman); WY (journeyman only)Hold an equivalent-class licence from a reciprocating state, have held it at least one year, and have passed that state’s examination.
Washington1OR (01 general journey level only)Oregon Supervising Electrician licence or a completed Oregon 8,000-hour apprenticeship; the licence must have been obtained by Oregon examination. Washington master certificates cannot be obtained through reciprocity at all.

Transcribed from the states’ own reciprocity application forms on 6 September 2026. Reciprocity is agreement-by-agreement and changes without notice; confirm with the receiving state before relying on it.

What the reciprocity forms show that the prose about reciprocity does not

HYRE analysis. Two forms is a small sample and we claim nothing about the other 49 jurisdictions. But they sit at opposite ends: Minnesota reciprocates with nine states, Washington with one. Both attach conditions that narrow the grant further — Minnesota requires the licence to have been held a year and won by examination in the granting state; Washington requires an Oregon examination and excludes its master certificate from reciprocity entirely.

HyreElectrical calculation. Cross-checking Minnesota’s nine partners against our own tier coding: every one of the nine is a tier-3 state — Alaska, Arkansas, Colorado, Iowa, Montana, Nebraska, North Dakota, South Dakota and Wyoming all issue a licence to the individual.

HYRE analysis. That is not a coincidence, and it is the structural point of this page. Reciprocity works by one state recognising another state’s examination of a person. Where no state examines the person, there is nothing to recognise. An electrician who has worked twenty years in Chicago holds a City of Chicago credential, and no state reciprocity agreement can reach it, because Illinois never issued anything. The same holds in Indiana, Kansas, New York and Pennsylvania — and, for the individual credential specifically, in the eleven tier-2 states as well.

HYRE analysis. The practical consequence runs the other way too. A tier-2 state licenses businesses, and a business licence is transferred by qualifying the business, not by recognising a person — which is why Florida’s route for an out-of-state applicant in §489.511 is an endorsement of an equivalent contractor licence plus a two-hour Florida Building Code course, and not a journeyman reciprocity at all.

The evidence ladder, rung by rung

Everything on this page sits on one of four rungs, and they are kept apart deliberately. A claim high on this ladder can be quoted as fact; one low on it cannot.

Rung 1 Statute and legislature record.
Missouri §§324.900–324.945, Florida §489.511, Utah Admin. Code R156-55b-302a, and the Kansas HB 2588 bill history. The state’s own binding text. Quotable as fact.
State statutes and legislature records, 6 September 2026
Rung 2 Issuing authority’s own page or form.
The Texas, California, Washington, Minnesota and Virginia thresholds, and both reciprocity state lists. Published by the body that issues the licence. Quotable, with its date.
TDLR, DIR, L&I, DLI, DPOR, 6 September 2026
Rung 3 Board of record, not re-verified.
The 38 register rows. Good enough to identify the right authority. Not quotable as a statement about that state’s classes or thresholds.
HyreElectrical licence register, 5 September 2026
Rung 4 Unverified.
Indiana. The agency site refused connections. Published as a gap, and it stays a gap until someone opens the authority’s own page.
Attempted 6 September 2026, twice

Using the matrix to check a licence

A records exercise, not an electrical one. Panel interiors, dead fronts and live circuits are work for a licensed electrician, and there is no homeowner step behind that cover. The full procedure — including the municipal registers for the tier-1 states and how to verify insurance — is on our licence-checking how-to.

  1. 1
    Find the tier before you search anything

    Tier 3: you can search a person. Tier 2: the state register describes only the company. Tier 1: the state has nothing to search and you need the city.

  2. 2
    Match the licence class to the work

    Classes carry scope. Florida’s Limited Energy Systems specialty tops out at 98 volts and is not a panel or service licence; Virginia’s tradesman card does not permit contracting. In Florida also check whether the licence is certified (statewide) or registered (local scope only). Read the class, not the word “active”.

  3. 3
    Ask for the permit, and stop there

    A permitted job creates a record with a licence number attached and an inspection at the end. If “will you pull a permit for this?” gets an evasive answer, no lookup fixes that. From here the work is the electrician’s.

Limitations

  • Thirty-nine of fifty-one rows were not re-verified on this pass

    This is the limitation that matters more than the rest together. The tier coding for those rows is derived from the desk’s board register of 5 September 2026, which recorded each authority and its public lookup, not each state’s statute. The coding is our reading of that register and could be wrong in a state whose structure is unusual. The status column says so on every affected row.

  • Indiana is a hole in the dataset, not an inference

    We could not reach the Indiana Professional Licensing Agency. Indiana is shown at tier 1 in the map because that is the desk register’s position, and it is flagged UNVERIFIED in the table so the map and the table cannot be read as agreeing independently. They are the same unchecked claim shown twice.

  • Municipal licensing cannot be enumerated nationally

    There are tens of thousands of political subdivisions in the United States and no national register of which of them license electricians. For tier-1 and tier-2 states this page can say the authority is local; it cannot tell you what your city requires, and nothing that claims to do so for all fifty states has checked.

  • The tier is a structural fact, not a quality judgement

    Nothing here says a tier-3 state protects consumers better than a tier-1 one. Chicago and New York City run demanding municipal programmes; some state programmes are thin. The axis is where the authority sits.

  • The threshold table is eight states, and the reciprocity table is two

    These are worked examples chosen because their documents were retrievable in full, not a sample. They support the claim that the units differ and that reciprocity is narrow and bilateral. They support no claim about the national distribution of thresholds, and we make none.

  • Licensing law changes, and the Kansas row proves it

    A bill that died this session can pass the next one. Every figure here carries its retrieval date for that reason, and a date more than a year old on a licensing page should be treated as unverified regardless of who published it — including us.

  • Lookup URLs were not all re-tested

    The public verification URLs come from the register of 5 September 2026. The 12 re-verified states had their authority re-opened on 6 September 2026. The rest were not re-fetched on this pass, and state agencies move pages without redirects.

Method

What was coded. Each of the 50 states and the District of Columbia was assigned one of three tiers on a single axis: whether the state issues an electrical licence to the individual electrician, only to the contracting business, or not at all. The tier is the coding; the issuing authority and public lookup are recorded alongside it.

Re-verification. Twelve jurisdictions were re-opened on 6 September 2026 at the level of the statute, the administrative rule, the issuing authority’s own page, or the legislature’s bill record: California, Florida, Illinois, Kansas, Minnesota, Missouri, New York, Pennsylvania, Texas, Utah, Virginia and Washington. Illinois, New York and Pennsylvania were verified negatively — by reading the complete list of professions the state licensing agency regulates and confirming that no electrical trade appears on it. Pennsylvania’s Bureau of Professional and Occupational Affairs publishes 29 boards and commissions; none is electrical. Kansas was verified against the legislature’s own bill history for HB 2588.

Retrieval route, recorded because an unrecorded workaround is how a source quietly stops being checked. Both Missouri state hosts — revisor.mo.gov and pr.mo.gov — failed TLS certificate validation from our retrieval host on the retrieval date, so the text of RSMo 324.920 and 324.925 was read from a full reproduction of the Missouri Revised Statutes current through 1 January 2025; the Revisor remains the source of record and its URL is published. adminrules.utah.gov returned 404 on the rule path, so R156-55b-302a was read from Cornell LII’s reproduction. www.in.gov refused connections twice, so Indiana was left UNVERIFIED rather than filled in. Two source documents are PDF application forms (Washington F500-148-000 and Minnesota CC0502); both were opened and read as documents and the state lists are transcribed from them.

What was not done. No municipal programme was enumerated. No licence threshold was converted between units. No state was coded from an aggregator, a licensing exam-prep site or a trade blog — where the authority could not be reached, the row says so. The 39 register rows were not re-opened at statute level and are labelled rung 3 on the evidence ladder above.

Independence. This site’s own contractor records cover five states and are 74 per cent Florida. They were not used as evidence for anything on this page, and no count on this page is derived from them.

Questions

Which states have no electrician licence at state level?
Illinois, Indiana, Kansas, New York and Pennsylvania issue no state electrical licence; licensing there is municipal. Missouri is commonly added to that list and does not belong on it — RSMo §§324.900–324.945 create a statewide electrical contractor licence, and §324.925 requires political subdivisions to recognise it in lieu of a local licence. Indiana is shown here as unverified: its licensing agency site refused connections when we checked.
Does Missouri require an electrician licence?
Missouri issues no statewide journeyman or master electrician licence, but it does issue a statewide electrical contractor licence through the Division of Professional Registration’s Office of Statewide Electrical Contractors. Under §324.925 a political subdivision may keep its own local licence but must recognise the statewide one for contracting and for permits. Under §324.900 a contractor working in a subdivision that requires no local licence does not need the statewide one either.
Is Kansas introducing statewide electrician licensing in 2027?
No. HB 2588 would have moved electrician licensing to the State Fire Marshal with an effect date of 1 July 2027, and it was reported favourably as amended by committees in both chambers in early 2026, but the Kansas Legislature’s own bill record shows it never reached enrollment or the Governor. Its status is “Died.” Kansas electrician licensing remains municipal. A later session could revive it.
What is the difference between a licensed electrician and a licensed electrical contractor?
The electrician is a person; the contractor is a business, or the individual who qualifies one. In 35 jurisdictions the state licenses both, separately, and one does not imply the other — a Virginia tradesman card does not permit contracting, and a California C-10 company still needs DIR-certified individuals doing the work. In 11 jurisdictions the state licenses only the business, and the individual’s credential, if any, is county or city issued.
Is Florida’s electrical licence a trade licence?
Not in the usual sense. Florida issues no statewide journeyman electrician licence. Its certified electrical contractor licence under Fla. Stat. §489.511 rests on three years of proven management experience in the trade within the preceding six years, four years as a supervisor or contractor within eight, or six years of comprehensive training within twelve, plus the certification examination. It qualifies the person who will be responsible for a business, not the person holding the tools.
Is this a complete 50-state comparison?
It is a complete 51-row matrix on one axis — who issues the licence — with a verification status published for every row. Twelve rows were re-verified against the state’s own statute, authority page or legislature record on 6 September 2026; 38 carry this desk’s board register of 5 September 2026 and are labelled as not re-verified; Indiana is published unverified. The licence-class and threshold detail covers eight states, not fifty, and the page says so rather than filling the gaps.

Written and audited by

HyreElectrical Research Desk

Primary-source research and fact checking

We read the model code, the federal safety notice, the municipal fee sheet or the utility tariff ourselves, and we publish the figure with the document it came from and the date we retrieved it. Where a number cannot be traced to a primary source, we publish the shorter page and say what we could not verify. HyreElectrical does not perform, supervise or warrant electrical work. Authorship is organisational: this desk, not a named persona.

10
long-form launch pages in this layout
5
states with verified licence records
16,369
electrical companies in those records
74%
of the store is Florida — disclosed first, not footnoted

How this desk works

  • Primary sources only. Code statements come from NFPA 70 as the model code. Safety statements come from CPSC. Permit fees come from the city or county fee sheet. Utility charges come from the filed tariff. We do not cite a blog that cites a source; we open the source.
  • Our contractor store is five states, and 74% of it is Florida. Any figure built on that store is titled to those states and names the concentration in the first screen. It is not a national sample of electricians.
  • Load calculations on this site are a published simplification in the shape of NEC 220.82 — first 10 kVA at 100%, remainder at 40%, HVAC at 100%, EVSE at 125%. They are labelled as not a stamped calculation. A licensed electrician using the adopted edition does that work.
  • No national price for a panel upgrade is shipped. Labour rates, the adopted code edition, whether the utility is involved, and the state of the existing wiring move the invoice too far for a roundup to help. Cost intent lives on the cost page; this page explains the decision.
  • We do not perform electrical work, and we take no payment for placement, ranking or a favourable mention. Nobody buys a position on this site.

Data as of 6 September 2026. Authorship on this site is organisational: the analysis belongs to the desk rather than to a named individual, and we do not publish credentials we do not hold. Our editorial policy sets out how we source, date and correct what we publish.

Sources & retrieval dates

  1. Missouri Revisor of Statutes — RSMo §324.925, Political subdivisions to recognize statewide licensure , Political subdivisions may keep a local electrical contractor licence but “shall recognize a statewide license in lieu of a local license”; non-compliant subdivisions have local sales-tax distributions withheld. Read via a full reproduction of the Missouri Revised Statutes current through 1 January 2025, because revisor.mo.gov failed TLS validation from our host on the retrieval date. Retrieved 6 September 2026.
  2. Missouri Revisor of Statutes — RSMo §324.920, Application requirements , 12,000 verifiable practical hours; 10,000 with a DOL-approved apprenticeship journeyman certificate; 8,000 with an associate degree; 4,000 supervising with an electrical engineering degree. Third-party accredited examination, $500,000 liability insurance, bond with each political subdivision that requires one. Retrieved 6 September 2026.
  3. Kansas Legislature — HB 2588 (2025–26), “Providing for statewide electrician licensing by the state fire marshal” , Committee reports in both chambers, February and March 2026; never enrolled, never presented to the Governor. Status: Died. This is the bill behind the widely repeated claim that Kansas begins statewide licensing on 1 July 2027. Retrieved 6 September 2026.
  4. Illinois Department of Financial and Professional Regulation — Regulated professions and industries , The complete list of professions IDFPR licenses. No electrician or electrical contractor appears on it; roofing contractor does, which is the useful contrast. Retrieved 6 September 2026.
  5. New York Department of State — Division of Licensing Services , The Division licenses 35 occupations across beauty, real estate, security and miscellaneous services. No electrical trade appears. Retrieved 6 September 2026.
  6. Pennsylvania Department of State — Bureau of Professional and Occupational Affairs, boards and commissions , 29 professional and occupational boards and commissions. None is electrical. Retrieved 6 September 2026.
  7. Texas Department of Licensing and Regulation — Apply for a New Journeyman Electrician License , “At least 7,000 hours of on-the-job training under the supervision of a Master Electrician licensed in Texas” allows early examination; 8,000 hours are required for licensure. Experience verified by the supervising master on a verification form. Retrieved 6 September 2026.
  8. California Department of Industrial Relations — Electrician Certification Unit, General Electrician , 8,000 hours of work for an electrical contractor, spread across two or more of nine categories with per-category caps (residential wiring 3,000; commercial 6,000; industrial 6,000; troubleshooting 1,500; stock room 300). Retrieved 6 September 2026.
  9. Washington State Department of Labor & Industries — Electrician certificates , 01 general journey level: 8,000 hours plus 96 hours classroom. 02 residential and the 4,000-hour specialties; further specialties at 2,000 hours. All require examination. Retrieved 6 September 2026.
  10. Washington State Department of Labor & Industries — Form F500-148-000, Application for a Reciprocal 01 General Journey Level Electrician Certificate (rev. 07-2026) , Reciprocity applies to Oregon only. The Oregon credential must have been obtained by Oregon examination. “Washington Master (01) General Journey Level Electrician Certificates cannot be obtained through reciprocity.” Retrieved 6 September 2026.
  11. Minnesota Department of Labor and Industry — Form CC0502, Individual Electrical License Reciprocity Application , Reciprocating states: Alaska (journeyman only), Arkansas (journeyman only), Colorado (journeyman only), Iowa, Montana (journeyman only), Nebraska, North Dakota, South Dakota, Wyoming (journeyman only). Requires an equivalent-class licence held at least one year and won by examination in the reciprocating state. Retrieved 6 September 2026.
  12. Minnesota Department of Labor and Industry — Electrical licensing basics , Licence classes: registered unlicensed electrician, journeyworker, master. Master qualifies via an electrical engineering degree, one year as a journeyworker, or five years in electrical planning and installation. 16 hours continuing education per cycle. Retrieved 6 September 2026.
  13. Virginia Department of Professional and Occupational Regulation — Tradesman application instructions , Journeyman: four years practical experience plus 240 hours vocational training; five plus 160; six plus 80; seven plus 40; or ten years observed experience. Master: one year as a licensed journeyman, or ten years practical experience. Retrieved 6 September 2026.
  14. Florida Legislature — Fla. Stat. §489.511, Certification; qualifications for certification , Three years proven management experience in the trade within six years; or four years as supervisor or contractor within eight; or six years comprehensive training within twelve; plus the certification examination. Endorsement route for equivalent out-of-state licences with a two-hour Florida Building Code course. Retrieved 6 September 2026.
  15. Utah Administrative Code R156-55b-302a — Qualifications for licensure, education and experience , Journeyman: 576 classroom hours (four years at 144) plus 8,000 hours as a licensed apprentice, or 16,000 hours. Master: 8,000 hours as a licensed journeyman, 4,000 with an applied-science degree, or 2,000 as an apprentice with an ABET-accredited engineering degree. Read via Cornell LII because adminrules.utah.gov returned 404 on the rule path. Retrieved 6 September 2026.
  16. HyreElectrical Research Desk — licence board register, 50 states and DC , The issuing authority and public verification URL of record for every jurisdiction, compiled from the boards’ own sites. Two rows — Kansas and Missouri — are corrected on this page against the register and the correction is shown in the table. Retrieved 5 September 2026.

Checking someone before you hire them?

Start with the tier. If your state licenses only businesses — or nothing at all — the state database will not answer your question, and the permitting office will. Tell us where the work is and we will connect you with licensed electrical companies in your area.

Look up your state board Read the guides

HyreElectrical does not perform, supervise or warrant electrical work, and takes no payment for placement, ranking or favourable mention. This page is research about licensing structure, not legal advice, and licensing law changes without notice — confirm any requirement with the issuing authority before relying on it. We have no relationship with any licensing board, examination provider or trade association named above.