Research
HyreElectrical research
We read the model code, the federal safety notice, the municipal fee sheet or the utility tariff ourselves, and publish the figure with the document it came from.
What this is
Original analysis of the American home electrical system, computed from primary sources and published with its method: Census Bureau housing tables, Consumer Product Safety Commission publications and investigation records, state licensing boards, and filed utility tariffs.
Every study names its source files, publishes its derivation, and states its limitations above the fold rather than in a footnote.
Research is attributed to the HyreElectrical Research Desk, never to an individual — the analysis is the organization’s.
HyreElectrical does not perform, supervise or warrant electrical work, and takes no payment for placement, ranking or favorable mention.
The four rules this desk works to
Primary sources only. Code statements come from NFPA 70 as the model code. Safety statements come from CPSC. Permit fees come from the city or county fee sheet.
Utility charges come from the filed tariff. We do not cite a blog that cites a source; we open the source, and we record the date we opened it.
Our contractor store is not a national sample. It holds 16,369 companies across five states, and 74 percent of it is Florida.
Any figure built on it is titled to those states in the headline, not in a note at the bottom.
National claims on this site rest on federal data or they are not made.
Fact, calculation, analysis and recommendation are four different things. A source fact is attributed to the source. A calculation says HyreElectrical calculated it. An interpretation says it is an interpretation. We never put our reading in an agency’s mouth.
Where a number cannot be traced, we publish the shorter page. A study that needs a figure we cannot source does not get the figure invented, padded around, or borrowed from a site that also could not source it. It gets published without that section, and the gap is named.
The studies
What this desk will not do
The research desk will not publish a national price for electrical work. Labor rates, the adopted code edition, whether the utility is involved and the state of the existing wiring move the invoice too far for a national average to help anyone. Cost questions are answered on the cost pages, locally, or not at all.
It will not rank electricians. A license evidences that a firm may contract for the work. It is not a quality score, and we do not manufacture one.
It will not give DIY instructions for live work. Reading a panel label is safe. Removing a dead front is not, and no page on this site will tell you to.
Questions
Who writes this research?
Can I reuse these figures?
How often is this updated?
Written and audited by
HyreElectrical Research Desk
Primary-source research and fact checking
We read the model code, the federal safety notice, the municipal fee sheet or the utility tariff ourselves, and we publish the figure with the document it came from and the date we retrieved it.
Where a number cannot be traced to a primary source, we publish the shorter page and say what we could not verify. HyreElectrical does not perform, supervise or warrant electrical work. Authorship is organizational: this desk, not a named persona.
- 16
- original research studies published
- 5
- states with verified license records
- 16,369
- electrical companies in those records
- 74%
- of the store is Florida — disclosed first, not footnoted
How this desk works
- Primary sources only. Code statements come from NFPA 70 as the model code. Safety statements come from CPSC. Permit fees come from the city or county fee sheet. Utility charges come from the filed tariff. We do not cite a blog that cites a source; we open the source.
- Our contractor store is five states, and 74% of it is Florida. Any figure built on that store is titled to those states and names the concentration in the first screen. It is not a national sample of electricians.
- Load calculations on this site are a published simplification in the shape of NEC 220.82 — first 10 kVA at 100%, remainder at 40%, HVAC at 100%, EVSE at 125%. They are labeled as not a stamped calculation. A licensed electrician using the adopted edition does that work.
- No national price for a panel upgrade is shipped. Labor rates, the adopted code edition, whether the utility is involved, and the state of the existing wiring move the invoice too far for a roundup to help. The cost pages publish named permit fees and the variables that move the price instead.
- We do not perform electrical work, and we take no payment for placement, ranking or a favorable mention. Nobody buys a position on this site.
Data as of September 2026. Authorship on this site is organizational: the analysis belongs to the desk rather than to a named individual, and we do not publish credentials we do not hold. Our editorial policy sets out how we source, date and correct what we publish.
Need the work done, not just the numbers?
Tell us what the job is and where the property is, and we will connect you with licensed electrical companies in your area.
HyreElectrical does not perform, supervise or warrant electrical work. Research on this site is published for information and is not advice on a specific property. We take no payment for placement, ranking or favorable mention.