Cost guide
EV charger installation cost is two variables, not a national average
Run length, and whether the panel has leftover capacity, move the electrician’s bill. The wall unit is often a separate retail purchase. Every dollar on this page names its source.
Written by HyreElectrical Research Desk Primary-source research and fact checking
The short answer
No national EV-charger install average appears here, and nothing on this page is a quote
Survey-of-quotes roundups (Angi, HomeAdvisor, Fixr, Thumbtack and their reprints) are aggregations of self-reported or contractor-submitted figures. They are not a measured sample of completed, inspected residential Level 2 jobs. This page does not reprint them as job cost. We did not find a primary-source, measured-job dataset for residential Level 2 installation that we will defend as a US average, so we do not ship one.
HyreElectrical does not perform, supervise or warrant electrical work, does not sell chargers, and does not quote jobs. Matching is still being built. Live 240-volt work is licensed work in most US jurisdictions. This page will not walk you through landing conductors or opening a panel.
The two drivers
A Level 2 charger is a continuous 240-volt load. The Department of Energy’s Alternative Fuels Data Center states that EV charging infrastructure is treated as a continuous load under the National Electrical Code, and that most of the rules sit in Article 625. This site’s circuit estimator applies the 125% continuous-load shape: a 32 A charger is a 40 A circuit class; a 40 A charger is a 50 A class; a 48 A charger is a 60 A class. That is the breaker conversation. It is not a price.
Driver 1 is distance. A panel on the garage wall and a parking space six feet away is a short indoor run of cable, a two-pole breaker, a disconnect if the instructions or the adopted code want one, and an inspection. A panel in a basement on the far side of a finished house, or a detached garage across a driveway, is a different job: longer conductor, often conduit, sometimes a trench, sometimes a subpanel, and restoration of whatever was opened. The charger SKU does not change. The run does. Indoor non-metallic sheathed cable (NM-B, the Romex-branded coil on a home-centre shelf) is listed for normally dry locations. A wet location, an outdoor wall, a buried crossing, or a garage that is a separate structure is a different wiring method — conduit, wet-rated conductors, or a feeder — even if the wall unit is the same.
Driver 2 is leftover capacity. Two shortages fail independently: amps and spaces. A 200 A panel can still be full. A dedicated 240-volt breaker usually wants two adjacent spaces; count those on the panel space checker rather than from a closed-door photograph. Spare amps are existing service minus existing calculated demand, not the number printed on the dead front — that arithmetic lives on the EV charger readiness tool and, for a whole-house demand estimate, on the load calculator. If leftover does not cover the continuous load, the conversation is a panel or service upgrade, or energy management under NEC 625.42, which is a different project: see load management. The panel-upgrade cost page is the separate job, when leftover is the driver.
Everything else — the brand of the wall unit, whether it is hardwired or plug-in, indoor versus outdoor listing — sits on top of those two. They are real product questions. They are not what makes two quotes on “an EV charger” differ by a factor of three. HyreElectrical analysis: a lump sum that does not name the one-way run and the leftover-amp result is not a quote you can compare with another lump sum.
What each driver actually changes
Short run, spare capacity
Panel in or next to an attached garage. A spare two-pole space. Load calculation leaves room for a 40 A or 60 A class circuit. Indoor cable, one breaker, one inspection.
The wall unit may not even be on the electrician’s invoice — many homeowners buy it separately. The job is the circuit.
Long run, no leftover capacity
Detached garage, or a panel a house-length away, plus a full panel or a service that the load calculation overshoots. Trench or long conduit. Possibly a subpanel. Possibly the utility, on the utility’s calendar.
This is no longer “an EV charger.” It is a feeder, a service conversation, or both. Ask for those lines to be named before anyone opens a wall.
The wall unit is a retail SKU. The circuit is a different purchase.
A quote that bundles the charger without saying so cannot be compared with a quote that does not. Buy the equipment after the circuit conversation, not before.
The EV charger installation page puts the load question before the product question. This cost page keeps the same split in dollars. The wall unit is a listed electric vehicle supply equipment (EVSE) SKU. You can buy it from the manufacturer, from Tesla Shop, from ChargePoint’s store, or from a retailer. On 5 September 2026 those list prices sat in a band of a few hundred dollars: $449.00 for the Emporia Classic, $599.00 for the Emporia Pro, $494–$539 for ChargePoint Home Flex hardwired, $539.00 for ChargePoint Home Flex plug-in, $535.00 for Tesla’s Wall Connector, $600.00 for Tesla’s Universal Wall Connector. Tesla’s Pedestal for Wall Connector listed separately at $425.00 — a mounting post, not a charger, and Tesla’s page states that pedestal installation typically requires trenching and a concrete pad. None of those figures is an installed job.
The circuit is what the electrician actually builds: a dedicated 240-volt branch, a two-pole breaker of the right class, conductor of the right size and wiring method, a disconnect if required, a listed receptacle if the unit is plug-in, making-good of whatever was opened, a permit, and an inspection. That bill exists whether the homeowner already owns the wall unit or the electrician supplies it. A $449.00 charger on your card and a $449.00 charger on theirs are the same hardware and a different invoice.
Hardwired and plug-in are two versions of that circuit, not two different products. A new NEMA 14-50 receptacle is still a new 50-amp, 240-volt branch. Emporia’s Classic product page, retrieved 5 September 2026, is explicit that a plug-in unit on a 14-50 is limited to 40 A, that the receptacle must be industrial-grade and continuous-duty rated, and that a standard residential-grade 14-50 is not designed for nightly EV charging. Tesla’s Wall Connector page states the unit must be installed by a qualified electrician. ChargePoint’s store states licensed-electrician installation is required for the hardwired Home Flex. Those are manufacturer instructions, not this site’s labour estimate.
HyreElectrical does not rank brands and does not sell chargers. The SKUs are cited because they are dated, public list prices for common Level 2 wall units — the part of the project a homeowner can actually look up. The Level 1 versus Level 2 selector stays in miles and hours for that reason. A model is a later question.
Named charger SKUs — hardware list prices, not installation
| Item | List price | What it actually measures | Source, geography, retrieved |
|---|---|---|---|
| Emporia Classic Level 2 wall unit | $449.00 | Manufacturer retail list for the charger SKU. Up to 48 A / 11.5 kW hardwired; 40 A on NEMA 14-50. Hardware only. | Emporia Energy shop, US, 5 September 2026 |
| Emporia Pro Level 2 wall unit | $599.00 | Manufacturer retail list. Same 48 A class; PowerSmart load management is in the SKU. Hardware only, not the circuit. | Emporia Energy shop, US, 5 September 2026 |
| ChargePoint Home Flex, hardwired | $494–$539 | ChargePoint store listing for the hardwired Home Flex (J1772 and NACS variants in that band). Hardware only. Licensed-electrician installation required. | ChargePoint store, US, 5 September 2026 |
| ChargePoint Home Flex, plug-in | $539.00 | ChargePoint store listing for the plug-in Home Flex. Hardware only. Still wants a 40 A or 50 A class circuit behind the receptacle. | ChargePoint store, US, 5 September 2026 |
| Tesla Wall Connector | $535.00 | Tesla Shop product-page list price. Hardware only. Page states the unit must be installed by a qualified electrician. Up to 11.5 kW / 48 A. | Tesla Shop, US, 5 September 2026 |
| Tesla Universal Wall Connector | $600.00 | Tesla Shop category listing. Hardware only. A different SKU from the Wall Connector, not a circuit. | Tesla Shop charging category, US, 5 September 2026 |
| Tesla Pedestal for Wall Connector | $425.00 | Mounting post. Tesla’s page states Wall Connector(s) and installation are not included, and that pedestal installation typically requires trenching and a concrete pad. | Tesla Shop, US, 5 September 2026 |
| ChargePoint NACS cable conversion kit | $199.00 | Accessory cable kit for an existing Home Flex. Not a charger and not a circuit. | ChargePoint store accessories, US, 5 September 2026 |
Manufacturer or manufacturer-store list prices on 5 September 2026. Local promotions move. None of these is an installed-job cost, a permit, or a run of cable.
A quote that includes one of these SKUs and a quote that does not are not comparable until someone says which. HyreElectrical does not sell chargers.
The circuit, priced as parts you can look up
The conductor is the line that actually scales with driver 1. Indoor NM-B is sold by the coil. On 5 September 2026 The Home Depot listed a Southwire 50 ft 6/2 NM-B coil (SKU 28894422) at $207.00 ($4.14 per foot) — 6 AWG copper is the 55 A class used on a 48 A / 60 A-class circuit. The same retailer’s 50 ft 6/3 NM-B (model 63950032) listed at $269.00 ($5.38 per foot); the third conductor is the line a 120/240-volt receptacle or a subpanel feeder sometimes wants, and is not required on every hardwired EVSE. A 32 A / 40 A-class circuit often uses 8 AWG. We retrieved two dated 8/2 coils rather than inventing a 50-foot price: Southwire 25 ft 8/2 NM-B (model 28893621) at $119.00 ($4.76 per foot) and Southwire 75 ft 8/2 NM-B (model 28893624) at $175.17 ($2.34 per foot). Local store prices may vary. These are indoor dry-location coils, not installed cost, and not a wet-location or underground wiring method.
The breaker is a small line and a large constraint. A Square D Homeline 60 A two-pole breaker (HOM260CP) listed at $18.24 on The Home Depot product page (internet #202353322) on 5 September 2026. That SKU plugs a Homeline bus. It does not plug a Siemens, Eaton, Square D QO, or Federal Pacific bus. A spare two-pole space on the wrong brand is not a spare. The $18.24 figure is a retail advertised price for one breaker, not the electrician’s distributor net, and not the labour of landing it.
Add those three indoor lines under a short-run, spare-capacity assumption and you still do not have a job price. You have a coil, a breaker, and a wall unit. Raceway, boxes, a disconnect, a listed 14-50 if the unit is plug-in, making-good, the permit, inspection, and hours at a billed rate are the rest of the electrician’s invoice. Outdoor, underground, and feeder work replace the NM-B coil with a different material list we did not retrieve as a single dated SKU, so those lines stay named rather than numbered.
Named circuit hardware — retail advertised, not installed
| Item | Advertised price | What it actually measures | Source, retrieved |
|---|---|---|---|
| Southwire 50 ft 6/2 NM-B (SKU 28894422) | $207.00 ($4.14/ft) | Indoor copper NM-B coil. 6 AWG is the 55 A class on a 48 A / 60 A-class circuit. Not installed cost. Not wet-location cable. | The Home Depot product listing, 5 September 2026 |
| Southwire 50 ft 6/3 NM-B (model 63950032) | $269.00 ($5.38/ft) | Indoor copper NM-B coil with a third insulated conductor. A different SKU from 6/2. Still not installed cost. | The Home Depot product listing, 5 September 2026 |
| Southwire 25 ft 8/2 NM-B (model 28893621) | $119.00 ($4.76/ft) | Indoor copper NM-B coil. 8 AWG is the 40 A class on a 32 A / 40 A-class circuit. Short coil. | The Home Depot listing, 5 September 2026 |
| Southwire 75 ft 8/2 NM-B (model 28893624) | $175.17 ($2.34/ft) | Same 8/2 indoor cable, longer coil, lower per-foot list. Still indoor NM-B. | The Home Depot listing, 5 September 2026 |
| Square D Homeline 60 A 2-pole breaker (HOM260CP) | $18.24 | Retail advertised plug-on breaker for a Homeline bus. Two spaces. Not a Siemens or QO breaker. Not labour. | The Home Depot product listing, internet #202353322, 5 September 2026 |
Retail advertised prices, retrieved 5 September 2026. Contractor net from a distributor is different and unpublished here. NM-B is an indoor dry-location wiring method.
Hardware is usually the small line on a short indoor run. Distance, access, leftover capacity and extras move the invoice. A bid that is mostly the charger SKU is either incomplete or not this job.
Driver 1, in working order: how far, and through what
Distance is not a vibe. It is a one-way length from the overcurrent device to the EVSE, plus the wiring method that length has to travel in. Six feet of indoor NM-B along an unfinished garage wall is a short pull and a short coil. Fifty feet through finished rooms is studs, plates, fire-blocking, and patching. A hundred feet to a detached garage is usually not NM-B at all: a feeder in conduit, often underground, with restoration of the drive, the lawn, or the slab on the way back. Tesla’s Pedestal page is useful here for a different reason than the $425.00 list price — it states, in those words, that pedestal installation typically requires trenching and a concrete pad. That sentence is about a post in a yard. A buried feeder to a detached garage is the same class of extra, whether or not anyone bought a Tesla post.
The wiring method is what turns “fifty feet” into two different jobs. NM-B is listed for exposed or concealed work in normally dry locations. A damp garage, an outdoor wall, a wet location, or a run underground wants a method the adopted code accepts for that location — often conduit with wet-rated conductors, or a cable assembly listed for the use. The 6/2 coil at $207.00 does not become a trench price by being stretched. Seattle’s 2026 Fee Subtitle prices a separate specialty permit for “underground work only (per inspection, raceways only)” at $146.00 plus the $55.48 administrative fee, a HYRE total of $201.48. That is an inspection fee for raceways, not the electrician’s price for digging, not restoration, and not a national trench average.
Access is the unstated multiplier on the same length. Unfinished garage or basement is one labour envelope. A finished kitchen wall, a second storey, a crawl, plaster, or a panel that has to be reached through a closet is another. Two electricians can measure the same 40 feet and write two different hour counts because one of them is fishing a finished wall. We do not have a sourced time-and-motion study of residential EV runs, so we do not convert feet into hours on this page. We do insist that a written quote name the one-way length and the wiring method. “EV charger install” is not a scope.
A subpanel in a detached structure is driver 1 becoming a feeder. The charger SKU is unchanged. The job is now a feeder, a second load centre, grounding at the separate structure, and whatever the adopted NEC edition requires for a building with a feeder. That is closer to the panel-upgrade conversation than to a 25-foot indoor coil. Ask for the feeder to be named as a feeder before comparing that bid with a garage-wall circuit.
Driver 2, in working order: leftover amps and leftover spaces
Spare capacity is not the number on the main breaker. A 200 A service with a calculated demand of 180 A has 20 A left. A 32 A charger at 125% continuous is 40 A of demand. Twenty is less than forty. That house does not have leftover for that charger, even though the dead front says 200. The readiness tool runs leftover amps versus a 32 A or 48 A circuit at 125%. It is not a stamped calculation and it is not a reason to open a live panel.
The 2023 model NEC added a floor on the service-side calculation. Section 220.57 says the EVSE load is 7,200 volt-amperes or the nameplate, whichever is larger. 7,200 VA is 30 A at 240 V, so a 16 A or 24 A unit still counts as 7,200 VA in a 2023-edition standard calculation. Jurisdictions on the 2020 or 2017 NEC do not have that floor. Optional calculations under 220.82 are a different path. Some inspectors want the EVSE held at 100% rather than riding the 40% remainder of an optional calc. That disagreement is why a site visit beats a web form, and why this page will not invent a “most houses have leftover” percentage.
Spaces fail on their own. A dedicated 240-volt breaker usually wants two adjacent slots. Tandem breakers already in the panel are not free slots. Two conductors under a lug listed for one is a defect, not a spare. A 200 A 20-space panel that is full is full. The next conversation is a subpanel, a larger load centre, or — if the calculated load is also over — a service change. Count spaces on the panel space checker. Do not treat a photograph of a closed door as a count.
When leftover does not cover the continuous load, two jobs replace “an EV charger.” One is a panel or service upgrade: load centre, possibly the meter, possibly the utility, on the utility’s calendar. Cost that job on panel-upgrade cost and decide it on when you actually need a panel upgrade. The other is energy management under model NEC 625.42: a listed system that sets the counted EVSE load at the managed maximum rather than the nameplate. That path is its own commercial page, load management. The hardware difference between Emporia’s Classic at $449.00 and Emporia’s Pro at $599.00 is $150.00 on 5 September 2026 manufacturer list — a SKU delta, not the installed cost of an energy management system, not a CT-clamp labour figure, and not a finding that every 100 A house can take a 48 A charger.
Permit fees from named schedules — not a national typical
Permit fees are municipal. They are not a percentage of the electrician’s bid unless that city writes them that way. Who pulls the permit is almost always the electrician. A quote that is silent on the permit is incomplete. Fees change; the URLs are in the sources so you can check the current schedule rather than trust a page written in September 2026.
Cities do not even use the same unit. Seattle prices a car charger by overcurrent size and then adds an administrative fee. Washington L&I, where L&I inspects, prices added circuits per panel. Portland prices a first branch circuit as a flat line, then adds a 12% Oregon state surcharge. Houston publishes a Level 1 / Level 2 / Level 3 charging-outlet table plus an administrative fee. Denver prices by valuation. San Francisco prices residential general wiring by outlet-and-device count. New York City starts with a $40.00 filing fee and, as of 29 June 2026, collects 50% of the electrical permit total at filing, not less than $130.00. Salt Lake City adds a $59.00 base to the chart line and a 1% Utah state fee, and requires plan review for new EV installations. Menlo Park publishes a residential EV-charger plan-check line and an inspection line. Oklahoma City prices five outlets or less at a flat residential figure. None of these is “permits typically $X nationally.”
Seattle’s 2026 Fee Subtitle (SMC 22.900D.150 Table D-15, plans not required) is the live schedule on 5 September 2026. Administrative fee $55.48. Level 2 car charger, 30–50 A, $52.56; plus admin is a HYRE total of $108.04. Level 2, 60–225 A, $108.04; plus admin is $163.52. Level 1, $26.28; plus admin is $81.76. Footnote 3 of that table states that car-charger fees include the branch circuits feeding them. The same table sets a $105.12 minimum for a standard OTC electrical permit, $292.00 for a 150–200 A new or altered service, and $146.00 for underground work only. A 150–200 A service plus admin is a HYRE total of $347.48 — that is a service inspection fee, not the electrician’s price for changing one.
Portland Permitting & Development’s electrical fee schedule effective 10 July 2026 prices a first branch circuit, without a service or feeder purchase, at $174.00, and each additional at $21.00. A 200 A service or feeder is $212.00. Portland’s residential electrical-permits page states a 12% Oregon State surcharge is assessed on all permit fees. HYRE applied that surcharge to the first-branch line: $174.00 × 1.12 = $194.88. The same arithmetic on the 200 A service line is $237.44. Plan review, when required, is 25% of the electrical permit fee. Those are Portland’s published lines plus Portland’s published surcharge, not a West-Coast typical.
Named municipal permit lines for a home charging circuit
| Jurisdiction | What the schedule prices | Fee as printed or HYRE sum | Document and date |
|---|---|---|---|
| City of Seattle, SDCI | Level 2 car charger, 208–240 V, 30–50 A, plans not required, plus administrative fee | $52.56 + $55.48 admin = $108.04 (HYRE addition). Footnote 3: car-charger fee includes the branch circuit. | Seattle 2026 Fee Subtitle, Table D-15 item 10 and item 1.a. Retrieved 5 September 2026. |
| City of Seattle, SDCI | Level 2 car charger, 60–225 A, plus administrative fee | $108.04 + $55.48 = $163.52 (HYRE addition) | Same Table D-15, item 10. Retrieved 5 September 2026. |
| City of Seattle, SDCI | Underground work only, per inspection, raceways only, plus administrative fee | $146.00 + $55.48 = $201.48 (HYRE addition). Inspection of raceways, not digging. | Same Table D-15, item 3.e. Retrieved 5 September 2026. |
| Washington State L&I (areas where L&I inspects) | Circuits added or altered, per panel, up to four circuits | $78.80 | L&I form F500-133-000, fees effective 1 July 2026. Retrieved 5 September 2026. |
| Washington State L&I | Altered service or feeder, 0–200 A (includes circuits) | $109.90 | Same worksheet, “Altered Service or Feeder” line. Inspection fee, not the electrician’s price for a service change. |
| City of Portland, PP&D | First branch circuit without a service or feeder purchase, plus 12% Oregon surcharge | $174.00 + 12% = $194.88 (HYRE). Each additional circuit $21.00 before surcharge. | Electrical Permit Fee Schedule effective 10 July 2026; surcharge from Portland residential electrical-permits page. Retrieved 5 September 2026. |
| Houston Permitting Center | Electrical Vehicle Charging Outlets Permit, Level 2, plus administrative fee | $100.71 + $33.56 admin = $134.27 (HYRE addition). Level 1 is $94.00; Level 3 is $107.42. | HPWCODE1056, retrieved 5 September 2026. Admin fee also on Houston’s 2026 fee-increase notice. |
| City and County of Denver, CPD | Building permit, valuation $1–$500 | $20.00, plan review $0 | ADMIN 125 and 138, Table 1, revision 21 May 2024. Retrieved 5 September 2026. Denver lists EV chargers as quick-permit eligible for single-family and duplex structures when the utility service is 400 A or less. |
| City and County of Denver, CPD | Building permit, valuation $501–$2,000 | $35.00, plan review $0 | Same Table 1. Above $2,000 the formula changes and plan review is 50% of the permit fee unless the job remains a quick permit. |
| City and County of San Francisco, DBI | Category 1 general wiring, residential buildings up to 10,000 sq ft, up to 10 outlets and/or devices (1 inspection) | $305.00 | Table 1A-E, Electrical Permit Issuance and Inspection, fees for permits issued on and after 12 July 2026. Retrieved 5 September 2026. An EVSE and a receptacle each count as a device under that table’s counting rule. |
| New York City, DOB | Electrical permit initial application (excluding minor work) | $40.00 filing line. From 29 June 2026, 50% of the electrical permit total is due at filing, not less than $130.00. | 1 RCNY §101-03; DOB construction advisory 2026-003. Retrieved 5 September 2026. Unit fees for switches, feeders and panels are extra and are itemised on the panel-upgrade cost page. |
| Salt Lake City Building Services | $59 base + residential service-change / minor-remodel line + 1% Utah state fee | $59.00 + $40.00 = $99.00; plus 1% = $99.99 (HYRE). Plan review is required for all new EV installations. | SLC Electrical Fee Schedule, updated 7/2026. Retrieved 5 September 2026. Detached-garage feeder, no meter base, is a separate $40.00 chart line. |
| Oklahoma City | Five outlets or less, residential dwelling unit, unrelated to a building permit and requiring no change in service | $100.00 | Oklahoma City Code, electrical permit fees effective 1 July 2026. Retrieved 5 September 2026. A 240-volt single-phase service up to 200 A is a different line at $175.00. |
| City of Menlo Park, CA | EV car charger, residential, 1–10 units: plan check + inspection | $229.45 plan check + $319.84 inspection = $549.29 (HYRE addition of two published lines) | 2026 Approved Master Fee Schedule, effective 14 July 2026. Retrieved 5 September 2026. |
Named authorities, different units for the same class of work: a device-amp table, a per-circuit fee, a valuation table, an outlet count, a filing floor, an EV-specific pair of lines. None of these is “permits typically $X nationally.”
A fifteenth city would not make a national fee. Your city is not in this list until its fee schedule is on the page. Who pulls the permit is almost always the electrician.
BLS OEWS 47-2111 is a wage input, not a job price
The May 2025 Occupational Employment and Wage Statistics median for electricians, SOC 47-2111, was $30.38 an hour ($63,190.00 a year). The Occupational Outlook Handbook, last modified 27 August 2026 and visited 5 September 2026, reports those medians from OEWS. The lowest tenth earned less than $42,640.00 a year ($20.50 an hour on a 2,080-hour year); the highest tenth more than $108,510.00 ($52.17 an hour). Inside electrical contractors and other wiring-installation contractors — the industry that employs most of them — the median was $61,570.00 a year. Government (excluding state and local education and hospitals) sat at $79,820.00; manufacturing at $74,550.00. Those are wages paid to wage-and-salary electricians, exclusive of premium pay.
OEWS counted 757,220 wage-and-salary electricians in May 2025 (BLS news release USDL-26-0725, 15 May 2026). The Occupational Outlook Handbook’s 821,000 jobs figure for 2025 includes self-employed workers, who are out of OEWS; the OOH puts self-employed workers at 7% of employment and electrical contractors at 66%. A billed residential rate carries payroll tax, workers’ compensation, vehicle, insurance, overhead and profit on top of whichever of those wages applies locally. This page does not invent a national multiplier for that stack, and it will not multiply an invented hour-count by $30.38 and call the product your invoice.
What we will do is show the arithmetic so the wage input is visible. Four electrician-hours at the May 2025 median is a HYRE product of $121.52. Eight hours is $243.04. Sixteen hours is $486.08. Those hour counts are planning placeholders, not a time-and-motion study of residential EV work. A short indoor run in an unfinished garage and a finished-wall feeder to a detached structure are not the same day. A contractor’s invoice for the same hours is higher by the stack above. The wage is a legitimate input. It is not what you will be billed.
Three worked illustrations — labeled as such
The three worked examples below are HyreElectrical illustrations built from sourced unit inputs. They are not quotes, not measured job costs, and not a range you should expect. Hour counts are placeholders so the wage arithmetic is visible; we do not have a sourced hour-count we trust, and inventing one would be a national average in disguise.
Read them as a way to parse a written bid, not as a price. Change the city and the permit line moves. Change the coil length and the cable line moves. Change the hours and the wage line moves. None of those movements is a US average. Type the lines you were actually given into the electrical project cost tool — it adds the figures you type and refuses to invent a national EV-install price.
Illustration A — short indoor run, spare capacity, 48 A / 60 A-class circuit
| Line | Figure | What it is |
|---|---|---|
| Wall unit, Emporia Classic, owner-supplied | $449.00 on the homeowner’s card, $0 on the electrician’s | Manufacturer shop, 5 September 2026. Hardware SKU, not installation. A quote that puts this line on the electrician’s invoice is a different invoice, not a more expensive circuit. |
| Southwire 50 ft 6/2 NM-B indoor coil | $207.00 | Home Depot SKU 28894422, 5 September 2026. Indoor dry-location cable. Local store prices may vary. Not installed cost. |
| Square D Homeline 60 A 2-pole breaker (HOM260CP) | $18.24 | Home Depot internet #202353322, 5 September 2026. Homeline bus only. Two spaces assumed spare. |
| Permit, Seattle 60–225 A Level 2 car charger + admin | $163.52 | SDCI 2026 Table D-15 item 10 + item 1.a. Footnote 3 includes the branch circuit. Another city is another number. |
| Same permit, Houston Level 2 charging outlet + admin | $134.27 | HPWCODE1056 + 2026 administrative fee. Do not average with Seattle. |
| Same permit, Portland first branch + 12% surcharge | $194.88 | PP&D schedule effective 10 July 2026 plus Portland’s published Oregon surcharge. HYRE. |
| Electrician wages, 4 hours at OEWS median | $121.52 | HYRE: 4 × $30.38. Wages, not billed labour. Four hours is a placeholder, not a measured short-run duration. |
| Electrician wages, 8 hours at OEWS median | $243.04 | HYRE: 8 × $30.38. Same caveat. |
Attached garage, panel on the garage wall, one-way indoor run inside a 50-foot 6/2 coil, spare two-pole Homeline space, load calculation has room for a 48 A / 60 A-class circuit. Homeowner supplies the wall unit.
Missing on purpose: billed-rate markup, boxes, disconnect, making-good, a 14-50 receptacle, outdoor or underground methods, and any utility charge. A bid that only contains the first row is shopping, not this job.
Illustration B — long run, spare capacity, still not a service change
| Line | Figure | What it is |
|---|---|---|
| Wall unit (same SKU as A) | $449.00 hardware, still owner-supplied | The charger did not move the price. The run did. |
| Indoor 6/2 coil from Illustration A | Does not apply | A detached garage or a house-length outdoor run is not an indoor NM-B coil. Substituting the $207 coil here would be a fiction. |
| Permit, Seattle underground work only + admin | $201.48 | Table D-15 item 3.e + admin. Raceway inspection, not digging, not restoration, not a trench average. |
| Permit, Salt Lake City EV as minor remodel | $99.99 | HYRE: $59.00 base + $40.00 service-change / minor-remodel line + 1% Utah state fee. Plan review is still required for new EV installations on the 7/2026 form. |
| Permit, San Francisco ≤10 outlets/devices | $305.00 | Table 1A-E Category 1, permits issued on or after 12 July 2026. One inspection in that band. |
| Electrician wages, 8 hours at OEWS median | $243.04 | HYRE placeholder. Finished walls, a trench, or a feeder will not stay on this row. |
| Electrician wages, 16 hours at OEWS median | $486.08 | HYRE placeholder if the run is through finished work or a separate structure. |
Same wall unit, same leftover capacity, different geography of the run. Conduit, a possible trench, restoration of the yard or drive, and a feeder to a detached structure are the usual surprises. They must be itemised, or they are not in the number.
We did not retrieve a dated national price for trenching, concrete, or wet-location conductors, so those lines stay named rather than numbered. Inventing them would be the national average this page refuses.
Illustration C — leftover capacity fails; two different jobs replace the circuit
| Line | Figure | What it is |
|---|---|---|
| Wall unit, Emporia Classic, no load management in the SKU | $449.00 | Manufacturer list. The SKU does not create spare amps. |
| Wall unit, Emporia Pro, PowerSmart in the SKU | $599.00 | Manufacturer list, 5 September 2026. HYRE hardware delta versus Classic: $150.00. That delta is not the installed cost of an energy management system. |
| Load-management path | A listed EMS / PCS under the adopted NEC 625.42 | A different job from a larger service. Decision page: load management. Not a price. |
| Panel- or service-upgrade path | A different invoice, often two (electrician and utility) | Decision page: panel upgrade. Cost page: panel-upgrade cost. No national panel figure is shipped there either. |
| Permit, Washington L&I altered service 0–200 A | $109.90 | Inspection fee where L&I inspects. Not the electrician’s price for changing a service. |
| Permit, Seattle 150–200 A service + admin | $347.48 | SDCI 2026 Table D-15 item 6 + admin. Service inspection, not a panel SKU. |
| Permit, Portland 200 A service or feeder + 12% surcharge | $237.44 | HYRE on the 10 July 2026 service/feeder line. Still not the upgrade. |
When leftover amps or leftover spaces fail, “an EV charger” is the wrong name for the work. Either the counted load is managed, or the service or panel changes. Mixing those lines into Illustration A is how a comparable circuit quote becomes an incomparable lump.
HyreElectrical does not recommend a path. The readiness tool, the load calculator, and a licensed electrician’s calculation in the adopted edition are what decide. This illustration exists so the two paths stay separate on a bid.
What the three illustrations are for
Use them to read a bid
If a written estimate has one lump sum called “EV charger install,” ask it to split: wall unit (included or owner-supplied), circuit (breaker class, conductor, one-way length, wiring method), panel or service work, permit, trench or restoration, extras. Put those lines through the project-cost tool.
Do not use them as your price
Four hours in an unfinished garage is not sixteen hours through plaster and a feeder. Seattle is not Houston. A HYRE sum of sourced unit inputs is arithmetic, not a market. HyreElectrical does not quote jobs.
How two unlike bids get mistaken for a market
The usual consumer move is to collect two or three lumps, average them, and treat the midpoint as “what it costs.” That only works if the lumps are the same job. They usually are not. One electrician priced a 40 A-class indoor circuit, owner-supplied charger, Seattle’s $108.04 car-charger-plus-admin line, and a morning in an unfinished garage. The next priced a 60 A-class feeder to a detached structure, bundled a $535.00 Wall Connector, a trench they did not print, and a load calculation that already overshoots. Averaging those two numbers does not locate a market. It hides driver 1 on one bid and driver 2 on the other.
The test is mechanical. Put both bids against the same itemisation: wall unit in or out, breaker class, one-way length, wiring method, leftover-amp result, leftover-space count, permit line, restoration line, change-order rule. If a line is missing, it is not in the number. If the two bids disagree on whether leftover covers a 48 A continuous load, they are not two prices for one job — they are two different jobs, and one of them may still need the panel-upgrade ledger or the load-management path. The project-cost tool will add the lines you type. It will not invent the missing ones.
HyreElectrical analysis: the information in a comparable pair of bids is the named run and the named leftover, not the two bottom lines. A cheaper lump that omitted the trench is not cheaper. An expensive lump that included a service change you do not need is not a finding about “EV charger installation cost.” It is a finding about scope. This site will not quote the job. It will insist the scope is written down before anyone treats a midpoint as a price.
Five different bills, often confused
1. The wall unit. A retail SKU, frequently bought by the homeowner. The list prices above — $449.00, $599.00, $494–$539, $539.00, $535.00, $600.00 — are what that line looks like when it is not bundled. A quote that includes the charger and a quote that does not are not comparable until someone says which.
2. The electrician’s bill. Labor hours at a local billed rate, plus the conductor, raceway, breaker, boxes, and any making-good of drywall. The BLS figure of $30.38 an hour (May 2025 median, SOC 47-2111) is the wage electricians were paid, exclusive of premium pay. It is a legitimate input. It is not what you will be invoiced. Electrical contractors billed a median annual wage of $61,570.00 for the occupation in the same release — still a wage, still not a trip charge. We will not multiply an invented hour-count by either number and call it your job.
3. The permit and inspection. Set by the city, the county, or in Washington by L&I outside cities that run their own electrical programs. The named schedules above are the evidence. They are small relative to a service upgrade and large relative to a $18.24 breaker. Seattle’s car-charger line includes the branch circuit; Portland’s first-branch line does not include a service change; Houston publishes a charging-outlet table; Denver prices valuation; San Francisco counts devices; New York City has a filing floor. Those are different instruments. Do not average them.
4. The utility bill, going forward. Not the install. EIA’s Electric Power Monthly for June 2026 (released 26 August 2026) puts the US residential average at 18.34 cents per kWh. California was 34.74 cents; Florida 15.10; Texas 15.94; Utah 13.37; Nevada 13.11; New York 29.49; Washington 14.91; Hawaii 52.72. Those are statewide sector averages from Form EIA-861M, preliminary. They are not your tariff.
5. The utility’s EV rate, if you enroll. Pacific Gas and Electric’s EV2-A tariff (Advice 7921-E, effective 1 June 2026) prices off-peak energy at $0.22558 per kWh year-round, summer peak at $0.53809, and winter peak at $0.41099, plus a daily base services charge that varies by income tier. Off-peak is midnight to 3 p.m. every day; peak is 4 p.m. to 9 p.m. PG&E’s consumer rate-plan PDF, effective 1 March 2026, rounds the same summer windows to 23¢ / 43¢ / 54¢. Charging at peak and charging overnight are different fuel prices. They have nothing to do with what the electrician billed last month.
What 60 kWh of charging costs at sourced rates — a HyreElectrical calculation
| Rate | Source | 60 kWh at that rate | What this is not |
|---|---|---|---|
| Nevada residential average, June 2026 | EIA Electric Power Monthly Table 5.6.A, 13.11¢/kWh | $7.87 | Not NV Energy’s tariff, and not an off-peak EV rate. |
| Utah residential average, June 2026 | Same EIA table, 13.37¢/kWh | $8.02 | Not Rocky Mountain Power’s tariff. |
| Florida residential average, June 2026 | Same EIA table, 15.10¢/kWh | $9.06 | Not FPL’s tariff, and not an off-peak EV rate. |
| Texas residential average, June 2026 | Same EIA table, 15.94¢/kWh | $9.56 | Not a retail plan in ERCOT. A statewide average. |
| US residential average, June 2026 | Same EIA table, 18.34¢/kWh | $11.00 | Not your bill. A national sector average, preliminary. |
| New York residential average, June 2026 | Same EIA table, 29.49¢/kWh | $17.69 | Not Con Edison’s tariff. A statewide average. |
| California residential average, June 2026 | Same EIA table, 34.74¢/kWh | $20.84 | Not PG&E, SCE or SDG&E. A statewide average. |
| Hawaii residential average, June 2026 | Same EIA table, 52.72¢/kWh | $31.63 | Not a mainland rate, and not an EV tariff. |
| PG&E EV2-A off-peak | EV2 tariff, $0.22558/kWh, effective 1 June 2026 | $13.53 | Energy only. Omits the daily base services charge. |
| PG&E EV2-A summer peak | Same tariff, $0.53809/kWh | $32.29 | The same 60 kWh, charged between 4 p.m. and 9 p.m. in summer. |
HyreElectrical calculation: 60 kWh × the published rate. 60 kWh is a round battery-shaped number, not a claim about your car. It is here so the electrician’s invoice and the ongoing fuel bill stay separate.
A 32 A × 240 V charger is 7.68 kW. 60 kWh at that rate is a little under eight hours on the plug. Your onboard charger, the state of charge you return with, and cold weather all move the session. The point of the table is the spread, not the session length.
Hardwired versus a new 14-50: still a circuit
A plug-in EVSE on a NEMA 14-50 looks like an appliance. Electrically it is a continuous 240-volt load on a dedicated branch. The receptacle is not a loophole around a permit, a load calculation, or a listed wiring method. ChargePoint’s plug-in Home Flex listed at $539.00 on 5 September 2026 — $45.00 to $45 above the bottom of the hardwired Home Flex band, and the same $539.00 as the top of that band. The plug did not delete the circuit. It changed the last few inches.
Emporia’s Classic page is the clearest manufacturer warning we retrieved on the receptacle itself. A NEMA 14-50 configuration is limited to 40 A. The outlet must be industrial-grade, 50 A, continuous-duty rated; Emporia names Hubbell, Leviton, Bryant, or Cooper (Eaton). A standard residential-grade 14-50 is not designed for the sustained load of nightly EV charging. The same page notes that the charger has built-in GFCI protection, and that a GFCI breaker at the panel can nuisance-trip on a plug-in unit — which is why Emporia recommends hardwired installation where a GFCI breaker is required. That is a listing-and-code conversation for a licensed electrician, not a DIY adapter.
Sharing a dryer receptacle, splitting it, or using an adapter on an appliance circuit is a design question for that electrician, not a cost saving this page will price. The connector on the car does not pick the circuit. SAE J1772 is the long-standing AC coupler; SAE J3400 is the standardised form of Tesla’s North American Charging Standard. ChargePoint’s NACS conversion kit listed at $199.00; Tesla’s Universal Wall Connector listed at $600.00 against the Wall Connector at $535.00. Adapters and second SKUs exist. None of that changes the ampere rating of the branch.
Level 1 is sometimes the whole job
The Alternative Fuels Data Center is plain: many EV owners meet daily driving on Level 1 overnight, “requiring no additional cost or installation, provided that a power outlet on a dedicated branch circuit is available near their parking location.” Level 2 is for less regular schedules, longer commutes, or larger batteries. That is a miles-and-hours question before it is a 240-volt question — the EV charger selector is built for it.
Level 1 is not free electricity and it is not always a free circuit. A random garage receptacle shared with a freezer is not a dedicated branch circuit. Seattle still prices a Level 1 car charger at $26.28 plus $55.48 administrative, a HYRE total of $81.76, when that is the device being permitted. Houston prices a Level 1 charging outlet at $94.00 plus $33.56 admin, a HYRE total of $127.56. Those are inspection fees for a 120-volt charging device, not a finding that Level 1 is free. But if the miles fit, the honest cost conversation may be “do I already have a dedicated 120-volt outlet,” not “what does a 60-amp feeder cost.” Skipping that question is how a household buys a 48 A wall unit for a seven-mile commute.
The federal credit that already ended
The Alternative Fuel Vehicle Refueling Property Credit — Internal Revenue Code §30C — paid 30% of the cost of qualifying personal-use property at a main home, capped at $1,000 per item, and only when the property sat in an eligible census tract (a low-income community tract or a non-urban tract).
P.L. 119-21, the One Big Beautiful Bill Act, moved the termination date from 31 December 2032 to 30 June 2026. The December 2025 instructions for Form 8911 state, in those words: you cannot claim the credit for alternative fuel vehicle refueling property placed in service after June 30, 2026. Today is after that date. Property placed in service from 1 January 2023 through 30 June 2026 may still be claimable on the return for that tax year; new installations after 30 June 2026 are not.
A page that still subtracts $1,000 from a 2026 install as if the credit were live is out of date. Manufacturer product pages retrieved 5 September 2026 still mention the federal credit in places; the IRS instructions are the authority, not a shop badge. This is not tax advice. The authority is the IRS, Form 8911, and the census-tract lists the Service publishes for the year the property was placed in service.
Trench, restoration, and the detached garage
If the parking space is not next to the panel, a restoration line exists whether or not it is printed. A saw-cut drive, a lawn, a sidewalk, or a slab that has to be opened and closed is not in the $207.00 indoor coil and is not in Seattle’s $201.48 raceway-inspection fee. We did not retrieve a dated municipal or RSMeans-free unit price for residential trenching that we will defend as a national figure, so this page names the line and leaves it blank. That is the shorter honest page. A bid that is silent on restoration, on a house whose charger is in a detached garage, is incomplete.
Salt Lake City’s 7/2026 electrical fee schedule prices “Electrical to detached garage, no meter base” at $40.00 on top of the $59.00 base and the 1% Utah state fee — the same dollar as the minor-remodel line, and a different scope. Portland’s 200 A service-or-feeder line at $212.00 before surcharge is what a feeder to a separate structure looks like in that schedule, not what the trench costs. Tesla’s Pedestal page, again, is useful as a manufacturer statement that a free-standing post typically wants a trench and a pad. Ask for those extras in writing. Unwritten extras are how a “cheap charger” becomes a second invoice.
Federal Pacific, Zinsco, and aluminium branch wiring are not EV-charger extras. They are separate scopes that a panel visit can uncover. Replacement of that equipment is its own job; do not let it hide inside an EV lump. Live work is licensed work. If you can smell burning, see sparks, or feel heat at an outlet or the panel, stop using the circuit and call a licensed electrician — those are not cost questions.
What a quote must itemize
- The wall unit, named
SKU, and whether it is included or owner-supplied. A $449.00 charger on your card and a $449.00 charger on theirs are the same hardware and a different invoice.
- The circuit, as a circuit
Breaker class (40 A or 60 A is the usual residential pair), conductor size, wiring method, and the one-way length of the run. “EV charger install” is not a scope. Use the circuit estimator to name the class, not the price.
- Panel work versus service work
A spare space and a spare amp are different shortages. A subpanel, a load-management device, and a service upgrade are three different jobs. See panel upgrade, panel-upgrade cost, and load management. Check leftover on EV charger readiness.
- Permit and inspection, named as a line
Who pulls it, which department, and the fee they will actually pay. The schedules above are examples, not your city.
- Trench, conduit, restoration
If the parking space is not next to the panel, this line exists whether or not it is printed. Detached garages live or die on it.
- Hardwired versus receptacle
A new 14-50 is still a new circuit. If the unit is plug-in, the receptacle listing (continuous-duty, industrial-grade) is part of the scope, not an afterthought.
- The change-order rule, in writing
What happens to the price if the run is longer than it looks, the panel is full, or the load calculation overshoots. Get that sentence before the first wall opens.
- Licence number
Confirm it against the board, not against the van. This site’s licence lookup is the starting point, not a verification of the person in front of you.
- A lump sum with no run and no panel
Not comparable to any other lump sum. Ask for the lines above, or use the project-cost tool to type the lines you were given rather than averaging two unlike bids.
Method and limitations
- No national install range is published here
We did not find a primary-source, measured-job dataset for residential Level 2 installation that we will defend as a US average. Survey-of-quotes roundups (Angi, Fixr, HomeAdvisor, Thumbtack) are surveys of quoted prices, not measured job cost; this page does not recycle them as the answer. The shorter honest page is the two drivers, the unit inputs, and the named permits.
- Hardware prices are list prices on a retrieval date
Emporia Classic $449.00, Emporia Pro $599.00, ChargePoint Home Flex hardwired $494–$539, plug-in $539.00, Tesla Wall Connector $535.00, Universal $600.00, Pedestal $425.00, Home Depot 6/2 NM-B $207.00 / 50 ft, 6/3 $269.00 / 50 ft, 8/2 25 ft $119.00, 8/2 75 ft $175.17, HOM260CP $18.24. They move. They are not installed cost.
- Permit fees are named schedules, not a typical
Seattle 2026 Fee Subtitle; Washington L&I F500-133-000 effective 1 July 2026; Denver ADMIN 138 revised 21 May 2024; Houston HPWCODE1056; Portland PP&D electrical schedule effective 10 July 2026 plus 12% Oregon surcharge; San Francisco Table 1A-E from 12 July 2026; NYC 1 RCNY §101-03 and the 29 June 2026 filing-floor advisory; Salt Lake City Electrical Fee Schedule updated 7/2026; Oklahoma City electrical fees effective 1 July 2026; Menlo Park master fee schedule effective 14 July 2026. Your city is not in that list until its fee schedule is on the page.
- BLS OEWS is a wage, not a job price
SOC 47-2111, May 2025 median $30.38/hour and $63,190.00/year; 10th–90th $42,640.00–$108,510.00; electrical-contractor industry median $61,570.00/year. Straight-time, excluding premium pay, excluding the self-employed. Useful as an input. Useless as an invoice.
- Utility figures are tariffs or EIA sector averages
EIA Table 5.6.A is a preliminary statewide and national average from Form EIA-861M, data for June 2026, released 26 August 2026. PG&E EV2-A is a filed tariff. Neither is your bill until it is your tariff and your kWh.
- The illustrations assume indoor NM-B on A, and refuse a trench price on B
A 32 A charger on a 40 A-class circuit often uses 8 AWG; a 48 A charger on a 60 A-class circuit often uses 6 AWG. We retrieved dated SKUs and used them. Substituting underground cable or a trench without a dated price would have been an invention.
- Hour counts are placeholders
4 / 8 / 16 hours are planning placeholders so the wage arithmetic is visible at three values, not a time-and-motion study. HYRE products: $121.52, $243.04, $486.08 at the May 2025 median.
- Not a quote, not DIY, not tax advice
Live 240-volt work is licensed work in most jurisdictions. This page will not walk you through landing conductors. HyreElectrical does not perform electrical work and does not quote jobs. §30C is described as the IRS published it; a tax professional applies it to a return.
Questions
How much does EV charger installation cost?
How much does a Level 2 charger cost to install versus the unit itself?
Do I need a panel upgrade to install an EV charger?
Do I need a permit to install a home EV charger?
Is there still a federal tax credit for a home EV charger?
How much does it cost to charge an EV at home?
Can I install a Level 2 charger myself?
What should I ask an electrician to put on the EV charger quote?
Is a NEMA 14-50 outlet cheaper than a hardwired charger?
Why will you not give me an average price?
Written and audited by
HyreElectrical Research Desk
Primary-source research and fact checking
We read the model code, the federal safety notice, the municipal fee sheet or the utility tariff ourselves, and we publish the figure with the document it came from and the date we retrieved it. Where a number cannot be traced to a primary source, we publish the shorter page and say what we could not verify. HyreElectrical does not perform, supervise or warrant electrical work. Authorship is organisational: this desk, not a named persona.
- 10
- long-form launch pages in this layout
- 5
- states with verified licence records
- 16,369
- electrical companies in those records
- 74%
- of the store is Florida — disclosed first, not footnoted
How this desk works
- Primary sources only. Code statements come from NFPA 70 as the model code. Safety statements come from CPSC. Permit fees come from the city or county fee sheet. Utility charges come from the filed tariff. We do not cite a blog that cites a source; we open the source.
- Our contractor store is five states, and 74% of it is Florida. Any figure built on that store is titled to those states and names the concentration in the first screen. It is not a national sample of electricians.
- Load calculations on this site are a published simplification in the shape of NEC 220.82 — first 10 kVA at 100%, remainder at 40%, HVAC at 100%, EVSE at 125%. They are labelled as not a stamped calculation. A licensed electrician using the adopted edition does that work.
- No national price for a panel upgrade is shipped. Labour rates, the adopted code edition, whether the utility is involved, and the state of the existing wiring move the invoice too far for a roundup to help. Cost intent lives on the cost page; this page explains the decision.
- We do not perform electrical work, and we take no payment for placement, ranking or a favourable mention. Nobody buys a position on this site.
Data as of 5 September 2026. Authorship on this site is organisational: the analysis belongs to the desk rather than to a named individual, and we do not publish credentials we do not hold. Our editorial policy sets out how we source, date and correct what we publish.
Sources & retrieval dates
- BLS Occupational Outlook Handbook — Electricians , May 2025 median pay $63,190.00 a year, $30.38 an hour, SOC 47-2111. 10th–90th $42,640.00–$108,510.00. Electrical-contractor industry median $61,570.00; government $79,820.00; manufacturing $74,550.00. 821,000 jobs in 2025 (includes self-employed). Wage statistics, not job prices. OOH last modified 27 August 2026. Retrieved 2026-09-05.
- BLS Occupational Employment and Wages — May 2025 news release (USDL-26-0725) , Electricians among the largest construction occupations at 757,220 wage-and-salary jobs. Released 15 May 2026. OEWS excludes self-employed workers. Retrieved 2026-09-05.
- EIA Electric Power Monthly, Table 5.6.A — Average Price of Electricity to Ultimate Customers by End-Use Sector, by State , June 2026 residential: US 18.34¢/kWh, Nevada 13.11, Utah 13.37, Florida 15.10, Texas 15.94, Washington 14.91, New York 29.49, California 34.74, Hawaii 52.72. Data for June 2026, released 26 August 2026. Preliminary estimates from Form EIA-861M. Retrieved 2026-09-05.
- Pacific Gas and Electric — Electric Schedule EV2 (Home Charging EV2-A) , Advice 7921-E, effective 1 June 2026. Total bundled energy: off-peak $0.22558/kWh; summer peak $0.53809; summer part-peak $0.42760; winter peak $0.41099; winter part-peak $0.39428. Peak 4 p.m.–9 p.m. daily. Plus a daily base services charge by income tier. Retrieved 2026-09-05.
- Pacific Gas and Electric — Residential rate plan pricing (consumer PDF) , Prices effective 1 March 2026. EV2-A summer windows rounded to 23¢ off-peak, 43¢ partial-peak, 54¢ peak. Complements the tariff sheet; the tariff is the filed rate. Retrieved 2026-09-05.
- Pacific Gas and Electric — Electric Vehicle (EV) rate plans , EV2-A off-peak midnight–3 p.m.; peak 4 p.m.–9 p.m.; partial-peak 3–4 p.m. and 9 p.m.–midnight. Links the filed EV2 schedule. Retrieved 2026-09-05.
- City of Seattle — 2026 Fee Subtitle, Table D-15 for 22.900D.150 , Electrical permit fees when plans are not required. Administrative fee $55.48. OTC minimum $105.12. Car chargers item 10: Level 1 $26.28; Level 2 30–50 A $52.56; Level 2 60–225 A $108.04. Underground work only $146.00. New or altered service 150–200 A $292.00. Footnote 3: car-charger fees include the branch circuits feeding them. Retrieved 2026-09-05.
- Washington State Department of Labor & Industries — Residential electrical fee worksheet F500-133-000 , Fees effective 1 July 2026. Circuits added or altered, per panel up to four: $78.80. Altered service or feeder 0–200 A: $109.90. Inspection fees where L&I inspects; some cities add their own. Retrieved 2026-09-05.
- Washington L&I — Purchase permits and request inspections , Confirms the fee worksheets are based on electrical WAC rules effective 1 July 2026, and that the fees cover inspection. Additional city fees may apply. Retrieved 2026-09-05.
- City of Portland — Electrical Permit Fee Schedule, effective 10 July 2026 , First branch circuit without service or feeder $174.00; each additional $21.00; 200 A service or feeder $212.00. Retrieved 2026-09-05.
- City of Portland — Residential Electrical Permits , A 12% Oregon State surcharge is assessed on all permit fees. Plan review, when required, is an additional 25% of the permit fees. Retrieved 2026-09-05.
- Houston Permitting Center — Electrical Vehicle Charging Outlets Permit (HPWCODE1056) , Level 1 $94.00; Level 2 $100.71; Level 3 $107.42. Administrative fee $33.56. Plans required for Level 3. Retrieved 2026-09-05.
- Houston Permitting Center — 2026 fee increase notice , Administrative fee $33.56; CPI increase 1.3910% effective 1 January 2026. Retrieved 2026-09-05.
- City and County of Denver — ADMIN 125 and 138, Building and Related Fees , Revision 21 May 2024. Table 1: valuation $1–$500 permit $20.00, plan review $0; $501–$2,000 permit $35.00, plan review $0. Quick permits have no plan-review fee. Retrieved 2026-09-05.
- City and County of Denver — Quick Permits, Electrical , Electric vehicle chargers listed as quick-permit eligible for single-family and duplex structures and garages when the utility service is rated 400 A or less, single-phase. Retrieved 2026-09-05.
- City and County of San Francisco, DBI — Table 1A-E, Electrical Permit Issuance and Inspection , Fees for permits issued on and after 12 July 2026. Category 1 general wiring, residential up to 10,000 sq ft: up to 10 outlets and/or devices (1 inspection) $305.00. Appliances and utilization equipment each count as one outlet or device. Retrieved 2026-09-05.
- NYC Department of Buildings — 1 RCNY §101-03, electrical permit fees , Electrical permit initial application $40.00 (excluding minor work). Unit fees for service switches, feeders and panels are additional. Retrieved 2026-09-05.
- NYC DOB — Electrical PAA fees construction advisory (2026-003) , From 29 June 2026, 50% of the electrical permit total is due at filing, minimum $130.00, remainder before inspection. Retrieved 2026-09-05.
- Salt Lake City Building Services — Electrical Fee Schedule , Updated 7/2026. All electrical permits have a $59.00 base fee plus the chart, plus a 1% Utah State Fee. Residential service change/alteration or minor remodel, single/two-family: $40.00. Electrical to detached garage, no meter base: $40.00. Plan review required for all new generator and EV installations. Retrieved 2026-09-05.
- Oklahoma City Code — electrical permit fees , Five outlets or less, residential dwelling unit: $100.00 effective 1 July 2026. Base fee, 240-volt single-phase service up to 200 A: $175.00 effective 1 July 2026. Retrieved 2026-09-05.
- City of Menlo Park — 2026 Approved Master Fee Schedule , Effective 14 July 2026. EV Car Charger (Residential) 1–10 units: plan check $229.45, inspection $319.84. Retrieved 2026-09-05.
- Emporia Energy — Classic Level 2 EV Charger product page , Manufacturer retail $449.00. Up to 48 A / 11.5 kW hardwired; 40 A on NEMA 14-50. Hardware only. Industrial-grade continuous-duty 14-50 required for plug-in. Retrieved 2026-09-05.
- Emporia Energy — Pro Level 2 EV Charger product page , Manufacturer retail $599.00. Up to 48 A; PowerSmart load management in the SKU. Hardware only. Retrieved 2026-09-05.
- ChargePoint store — Home Flex chargers , Home Flex hardwired listed $494.00–$539.00. Home Flex plug-in listed $539.00. Hardware only. Licensed-electrician installation required for the hardwired unit. Retrieved 2026-09-05.
- ChargePoint store — accessories , NACS cable conversion kit for Home Flex $199.00. Home Flex replacement cable (J1772) $179.00. Retrieved 2026-09-05.
- Tesla Shop — Wall Connector , Product page listed $535.00. Hardware only. Page states the Wall Connector must be installed by a qualified electrician. Up to 11.5 kW / 48 A. Retrieved 2026-09-05.
- Tesla Shop — Charging category , Wall Connector $535.00; Universal Wall Connector $600.00; Mobile Connector $300. Retrieved 2026-09-05.
- Tesla Shop — Pedestal for Wall Connector , Listed $425.00. Wall Connector(s) and installation not included. Page states pedestal installation typically requires trenching and a concrete pad. Retrieved 2026-09-05.
- The Home Depot — Southwire 50 ft. 6/2 Stranded Romex SIMpull CU NM-B W/G Wire (28894422) , Retail listing $207.00 ($4.14/ft) for a 50-foot coil of indoor 6/2 NM-B. Local store prices may vary. Hardware, not installed cost. Retrieved 2026-09-05.
- The Home Depot — Southwire 50 ft. 6/3 Stranded Romex SIMpull CU NM-B W/G Wire (63950032) , Retail listing $269.00 ($5.38/ft). Indoor NM-B. Local store prices may vary. Retrieved 2026-09-05.
- The Home Depot — Square D Homeline 60-Amp 2-Pole Circuit Breaker (HOM260CP) , Advertised $18.24. Homeline bus only. Internet #202353322. Retrieved 2026-09-05.
- IRS — Instructions for Form 8911 (Rev. December 2025) , P.L. 119-21 changed the §30C termination date from 31 December 2032 to 30 June 2026. Personal-use property at a main home: 30% of cost, limited to $1,000 per item. Eligible census tract required. Cannot claim for property placed in service after 30 June 2026. Retrieved 2026-09-05.
- IRS — Alternative Fuel Vehicle Refueling Property Credit for Individuals , Individual 30C credit as amended: 30% up to $1,000 per charging port, main home, eligible census tract, original use. Applies to property placed in service 1 January 2023 through 30 June 2026. Retrieved 2026-09-05.
- US Department of Energy, Alternative Fuels Data Center — Charging Electric Vehicles at Home , Level 1 often meets daily range overnight with no additional installation if a dedicated outlet exists. Level 2 for longer dwell-time needs. EV charging is a continuous load; NEC Article 625. Permits may be required. Retrieved 2026-09-05.
- NFPA 70, National Electrical Code , Cited as the model code. Continuous-load 125% shape, Article 625, 220.57 (2023) and 625.42 load management are the adopted-edition conversation in each jurisdiction, not a quoted table on this page. Retrieved 2026-09-05.
The next useful step is the circuit, not a SKU
Check leftover amps against a 32 A or 48 A charger, then look at the job — or tell us the project and the zip code and we will follow up about connecting you with licensed electricians serving your area. HyreElectrical does not perform electrical work and does not quote jobs.
HyreElectrical does not perform, supervise, inspect or warrant electrical work, and does not sell chargers. This page is general information. It is not a quote, a permit, a load calculation, or tax, legal or professional advice. Live 240-volt work is licensed work in most jurisdictions.