Electrical panel upgrade cost is two bills, not one

The electrician’s price and the utility’s service charge are separate ledgers. Quotes surprise people because every competing page adds them together. This one does not.

Updated September 2026 · Data as of 5 September 2026

Written by HyreElectrical Research Desk Primary-source research and fact checking

Two bills electrician and utility, shown separately The reason quotes surprise people
$30.38 median electrician hourly wage BLS OEWS SOC 47-2111, May 2025
$400.00–$5,273.00 named-utility service charges in this sample Austin Energy, Seattle City Light; not a US average

The short answer

A residential panel upgrade is two invoices, not one. The electrician bills for the load centre, customer-side conductors, labour, making-good and the permit they pull. The utility bills separately — or not at all — for the service drop or lateral, the meter, a transformer contribution, and anything it owns on its side of the point of delivery. HyreElectrical does not publish a national “$X–$Y to upgrade a panel,” because those two ledgers do not share a distribution and we have no sourced national sample of completed jobs. What we can show, with retrieval dates, is the unit inputs: a May 2025 OEWS median electrician wage of $30.38/hour; a Home Depot-advertised 200 A 40-space Homeline load centre at $268.21; a Homeline outdoor meter-main combination (SC2040M200C) at $324.12; named 2026 permit line items running from a Los Angeles County issuing-plus-service sum of $99.70 to a San Francisco Category-1 line of $580.00 that already bundles a 200 A upgrade with up to 40 outlets; and five utilities’ own published charges, from $0.00 on the Con Edison side if you accept the Company Plan to $5,273.00 for Seattle City Light’s standard 0–200 A underground single-phase charge. HyreElectrical does not perform electrical work and does not quote jobs. Live work is licensed work.

No national panel-upgrade average appears here, and nothing on this page is a quote

Survey-of-quotes roundups (Angi, HomeAdvisor, Fixr and their reprints) are labelled as such when they appear in search results: they are aggregations of self-reported or contractor-submitted figures, not a measured sample of completed, inspected jobs. This page does not reprint them as job cost. A roundup that prints one “typical panel upgrade” range is doing the thing this page exists to refuse: it is adding an electrician’s invoice to a utility contribution, averaging unlike jobs, and selling the blend as a price.

The research study that would measure completed residential panel and service jobs nationally — ELE-09, planned at a path this site has not published — is not written. This page uses the same source classes that study would use (BLS OEWS SOC 47-2111, published material prices, municipal fee schedules, named utility tariffs) and does not invent that study’s findings. ELE-66, the study that would sample utility tariffs nationally, is CHECK-blocked. There is no synthesised US utility-fee table here. What we have opened and read in full is the permit side: twelve fee schedules applied to one identical job.

HyreElectrical does not perform, supervise or warrant electrical work, and matching is still being built. Nothing here is a bid. Service, meter and panel work is licensed work in almost every US jurisdiction. This page will not walk you through opening a panel.

What the job actually is

Four different orders of work get sold as “a panel upgrade.” They are not four sizes of one job. The first question on a bid is which of the four is being priced.

Like-for-like panel replacement
The load centre is swapped at the same ampacity. The utility may still need to pull the meter. The service conductors and the utility’s facilities may not change. This is the interior-only job.
Service upgrade (ampacity change)
The incoming service is resized — commonly 60 A or 100 A to 200 A. The utility is a party. The meter socket, mast or lateral, and often the transformer, move with it. This is a different job from replacing the box on the wall.
Meter-main / combination service equipment
A meter socket and a main breaker in one enclosure, usually outdoors. The 2020 NEC’s emergency-disconnect rule (230.85), where adopted, often pushes a service upgrade toward this shape rather than an indoor main-breaker panel alone.
Subpanel only
The service and the main panel stay. A second load centre is added for spaces or a detached structure. Cheaper than a service upgrade when the constraint is spaces, not amps. Count spaces on the panel space checker before treating a full 200 A panel as a service problem.

Why four jobs get sold as one, and why that ruins a quote

The phrase “panel upgrade” is a sales category, not a scope. A homeowner searching that phrase is usually in one of four conversations, and the invoices they will see are different in each. The decision rule for which conversation you are in lives on the service page: when you actually need a panel upgrade. That page will not invent a national average either. This page owns the money conversation that follows the decision.

A like-for-like swap is a customer-side job. The electrician opens the existing enclosure, lands the existing branch circuits on a new bus, and the utility may still have to pull the meter for a few hours. If the ampacity is unchanged, several named utilities in the sample below list a $0 amp fee or a $0 company-side contribution. That $0 is not “the upgrade is free.” It is the utility’s ledger being empty while the electrician’s is not.

A service upgrade is two parties on two calendars. The electrician rebuilds the customer-owned entrance — mast or lateral, meter socket, load centre, grounding electrode system, often a meter-main because the adopted code wants an outdoor emergency disconnect. The utility resizes or replaces what it owns on its side of the point of delivery. Those two pieces of work do not share a price list, a permit, or a completion date. Competing pages add them together and call the sum “what a 200 amp panel costs.” The sum is not a job.

A meter-main combination is often what a 2020-or-later NEC jurisdiction actually requires when the service is being touched. NEC 230.85, in the 2020 cycle, requires an emergency disconnect in a readily accessible outdoor location for one- and two-family dwellings. Where that edition (or a later one) is adopted, “replace the indoor panel” is frequently the wrong SKU. The Home Depot-advertised Homeline outdoor combination SC2040M200C at $324.12 is a different hardware line from the indoor HOM4080M200PC at $268.21. The difference between those two advertised prices is $55.91 of retail hardware, not of labour, not of the utility, and not of the permit. Who owns the mast is a utility rule, not a preference.

A subpanel is the job when the constraint is spaces, not amps. A 200 A panel with every slot occupied cannot take an EV breaker, a heat-pump breaker and a range breaker, even if the load calculation still has spare demand. Tandems already in use, double-tapped lugs and a Federal Pacific or Zinsco bus are extras, not line items you discover after the bid. Count spaces on the panel space checker and run the demand on the load calculator as two questions. If the house is adding a charger, the charger conversation is its own cost page: EV charger installation cost.

What moves the electrician’s bill

The electrician’s invoice is labour, customer-owned material, permit pass-through and making-good. Ampacity change versus interior-only is the first fork: a same-size panel swap in an unfinished garage is a different day of work from a 100 A-to-200 A change that rebuilds the mast, the meter socket and the service-entrance conductors through a finished wall. The load-centre SKU is usually the small line on that invoice. The hours, the access, the extras and the permit are the large ones.

Spaces matter independently of amps. A 200 A panel with no spare slots is full. Adding an EV circuit, a heat pump and a range to a packed bus is a subpanel job or a service conversation, not “two more breakers.” Tandems already in use, double-tapped lugs and a Federal Pacific or Zinsco bus are extras, not line items you discover after the bid. A bid that prices only the new load centre, on a house that has any of those, is incomplete on purpose or by accident.

Location of the panel, and who owns the mast, decide how much of the run is the electrician’s. An indoor load centre fed from an outdoor meter through a short, accessible chase is one labour envelope. A panel in a finished closet, a meter on the far side of the house, a customer-owned underground lateral, or a mast the utility will not touch, is another. Drywall, plaster, a second storey, a crawl, a panel that has to move to satisfy 230.85, and restoration of a driveway over a customer-owned lateral are the lines that turn eight hours into twenty-four. This page does not invent a national hour-count for any of those. The 8 / 16 / 24 hour placeholders in the illustrations below are arithmetic devices so the wage input is visible at three values, not a time-and-motion study.

Aluminium branch wiring and Federal Pacific / Zinsco equipment are not “panel upgrade” work. They are remediation that a panel swap can uncover, and they change the electrician’s bill when they are in the house. Replacement of Stab-Lok equipment is its own job: see Federal Pacific replacement. Aluminium branch connections are a CPSC-recognised repair-versus-replace conversation that a new panel does not, by itself, close: see aluminum wiring remediation. Cost them on those pages, not as a silent adder on this one.

Labour is local. The May 2025 Occupational Employment and Wage Statistics median for electricians (SOC 47-2111) was $30.38 an hour ($63,190.00 a year). The lowest tenth earned less than $42,640.00; the 25th percentile $49,430.00; the 75th $83,940.00; the highest tenth more than $108,510.00. Inside electrical contractors — the industry that employs 66% of them, per the Occupational Outlook Handbook — the median was $61,570.00 a year. Government electricians sat at $79,820.00; manufacturing at $74,550.00; employment services at $57,760.00. Those are wages paid to wage-and-salary electricians, not billed rates. Payroll tax, workers’ compensation, vehicle, overhead and profit sit on top, and this page does not invent a national multiplier for them.

The electrician-side forks, in one pass

Ampacity change vs interior-only

Same-size replacement can leave the utility’s conductors alone. Resizing the service cannot. Ask which of the two is on the bid before comparing prices.

Spaces

A full 200 A panel is still full. Spaces and amps fail independently. Run the panel space checker and the load calculator as two questions, not one.

Location and access

Unfinished garage or basement is one labour envelope. Finished walls, a second storey, a crawl, or a panel that has to move, is another. Access is usually the largest unstated line.

Meter-main and the mast

Where the adopted NEC edition requires an outdoor emergency disconnect, a “panel upgrade” is often a meter-main combination and a new riser, not a box in the utility room. Who owns the mast is a utility rule, not a preference.

Aluminium and FPE extras

Aluminium branch wiring and Federal Pacific / Zinsco equipment are separate scopes. A bid that prices only the new load centre, on a house that has either, is incomplete on purpose or by accident.

BLS wages as inputs — not a billed rate, not a job price

Every wage figure on this page is an Occupational Employment and Wage Statistics number for electricians, SOC 47-2111. Straight-time. Not a trip charge. Not a quote. The arithmetic below is HYRE: hours × a published median. It is here so a bid’s labour line has something to be compared with besides another bid.

The Occupational Outlook Handbook, last modified 27 August 2026, puts the May 2025 median for electricians at $63,190.00 a year, which is $30.38 an hour. The OEWS 10th–90th annual band is $42,640.00–$108,510.00; the hourly band is $20.50–$52.17. The 25th and 75th percentiles, from the same May 2025 OEWS distribution as republished by O*NET OnLine, are $49,430.00 and $83,940.00 a year ($23.76 and $40.36 an hour). OEWS counted 757,220 wage-and-salary electricians. The Handbook’s 821,000 jobs figure for 2025 includes the self-employed, who are out of OEWS; the Handbook puts that self-employed share at 7%. Those two employment numbers are not a disagreement. They are two frames.

Industry of employment moves the wage inside the same occupation. The Handbook’s May 2025 industry medians for electricians: electrical contractors and other wiring-installation contractors, $61,570.00; government excluding state and local education and hospitals, $79,820.00; manufacturing, $74,550.00; employment services, $57,760.00. Most of the people who will bid a residential panel work for the first of those. $61,570.00 a year is still a wage paid to an employee, not the number on the invoice you will be handed.

Geography moves it further, which is the point of refusing a national billed average. O*NET OnLine’s local-wage tables, citing the same May 2025 BLS OEWS estimates, put the median annual wage for electricians at $99,560.00 in Illinois ($47.87 an hour), $95,220.00 in Washington ($45.78), $78,750.00 in New York ($37.86), $102,350.00 in the Chicago-Naperville-Elgin metro ($49.21), $101,780.00 in Seattle-Tacoma-Bellevue, $105,090.00 in Portland-Vancouver-Hillsboro, and $63,150.00 in Denver-Aurora-Centennial ($30.36). Those are seven named geographies, not a sample of the United States, and they are still wages. Eight hours at the national median is $243.04. Eight hours at the Illinois median is $382.96. Eight hours at the Washington median is $366.24. Eight hours at the New York median is $302.88. Eight hours at the Chicago metro median is $393.68. Eight hours at the Denver metro median is $242.88. The spread between those eight-hour wage products is not “what a panel costs in Illinois versus Denver.” It is the labour input moving before anyone has opened a wall, pulled a permit, or spoken to a utility.

A contractor’s billed rate is higher than any of those medians because it carries payroll burden, workers’ compensation, vehicle, insurance, overhead and profit. This page does not invent a national multiplier for that stack. A page that multiplies $30.38 by an invented hour-count and an invented markup, then prints the product as “the average cost to upgrade a panel,” is manufacturing the national average we refused in the first paragraph. Type the labour line you were actually quoted into the electrical project cost tool. It will add the figures you type. It will not invent a national panel average either.

Wage inputs at three hour-counts — HYRE arithmetic, not a bid

Wage input8 hours16 hours24 hoursWhat this is
US OEWS median, $30.38/hr$243.04$486.08$729.12May 2025 national median, SOC 47-2111. Wages, not billed labour.
Illinois OEWS median, $47.87/hr$382.96$765.92$1,148.88O*NET republication of May 2025 OEWS. Illinois, not a Midwest average.
Washington OEWS median, $45.78/hr$366.24$732.48$1,098.72Same source. Washington State, not Seattle City Light’s bill.
New York OEWS median, $37.86/hr$302.88$605.76$908.64New York State. Not NYC DOB’s permit, not Con Edison’s tariff.
Chicago-Naperville-Elgin metro, $49.21/hr$393.68$787.36$1,181.04Metro median. A different geography from the Illinois statewide median above.
Denver-Aurora-Centennial metro, $30.36/hr$242.88$485.76$728.64Metro median sitting next to the national median, not under it as a “cheap market.”

HYRE: published hourly median × 8, 16 or 24. Hour counts are placeholders so the wage arithmetic is visible. They are not a time-and-motion study of a panel swap. Retrieved 5 September 2026.

Do not add a row to this table and call the result a regional job cost. The permit, the hardware, the extras and the utility are still missing. Payroll burden is still missing.

What moves the utility’s bill

The utility’s charge is not a tip on the electrician’s invoice. It is a tariffed contribution for facilities the utility owns: the overhead drop or underground lateral, the meter, sometimes a transformer, sometimes a line extension. Who pays, and how much, is written in that utility’s service-extension rule. Neighbouring utilities do not use the same rule. A house on one side of a municipal boundary can see a posted $400.00 contribution; a house on the other side can see a $0.00 company-side replacement of inadequate overhead. Those are not two observations of one national fee.

This is not a US average. ELE-66, the study that would sample utility tariffs nationally, is not published. What follows is five named utilities, quoted from their own pages, retrieved 5 September 2026. Do not treat the spread as a distribution. A sixth utility would not make this a national table.

Austin Energy publishes contribution-in-aid-of-construction charges for residential services that do not need a design: overhead service with a standard 200 A meter, up to 75 feet of service wire, is $400.00; underground service with a standard 200 A meter, up to 150 feet, is $800.00. A standard single-phase meter up to 320 A, where the service wire is already provided, is $200.00. The 320 A underground figure is $1,600.00; the 320 A overhead figure is $400.00. Specialty metering is actual cost. Where an Austin Energy design is required, the meter and service-wire charges are folded into the total line-extension cost instead of this menu. Page last reviewed 26 February 2026. These are Austin Energy’s charges, in Austin Energy territory, when no design is required. They are not a Texas average.

Seattle City Light publishes standard service charges in DPP 500 (effective 25 June 2025): $1,436.00 for 0–200 A overhead single-phase and $5,273.00 for 0–200 A underground single-phase. A separate amp fee of $6.36 per amp, with a 200 A credit on 120/240 V single-phase, applies when requested amps exceed the credit. DPP 500’s own worked example for a new 200 A 120/240 V single-phase service computes the amp fee as $6.36 × (200 − 200) = $0.00. A rewire with no increase in service size is listed at $0.00 amp fee. The amp fee is separate from, and not included in, the time-and-materials billing threshold. The $1,436.00 and $5,273.00 figures are the standard service charges; they are not the electrician’s price for changing the panel.

Con Edison states, in its electric-vehicle interconnection guide (revised 2026), that electric service is provided at no cost when the customer accepts Con Edison’s plan (“Company Plan”), and that there is no cost to customers for the Con Edison portion of service upgrades or new service if they accept that plan. Customers may still pay for customer-side work inside the property line. Temporary service is billed in full. That is Con Edison’s rule, not a national one, and it is not a waiver of the electrician’s invoice, the NYC electrical permit, or anything the customer owns on the house side of the point of delivery.

Dominion Energy Virginia (Virginia Electric and Power Company), in Terms and Conditions Section XXII.F, Service Upgrades, effective 1 January 2026 (filed 9 December 2025), states that for a previously served, individually metered permanent residence not located in a designated Underground Distribution Area, the Company will replace inadequate overhead facilities with adequate overhead facilities at no cost to the Customer. Inadequate underground facilities are also replaced at no cost, except where the Company deems the composition of the land such that normal trenching cannot be used — in which case the customer pays the amount by which the estimated underground cost exceeds the estimated cost of normal trenching — or where the customer requests or is required to install branch-feeder facilities off the Company’s Preferred Route, in which case the customer pays the difference in estimated installed cost. “Inadequate,” in XXII.A.1, means facilities that do not have the capacity to serve the load at the existing service characteristics. That $0.00 company-side figure is Dominion’s rule for replacing inadequate overhead, in Dominion Virginia territory, on a previously served house. It is not a $0 electrician. It is not Austin Energy. It is not Seattle City Light.

PG&E Electric Rule 16 applies the residential allowance determined under Rule 15 to service facilities first. Rule 15’s current residential allowance is $3,255.00 per meter or dwelling unit. Costs above the allowance are the applicant’s. Mixed-fuel new-construction allowances have been removed. PG&E’s SB 1210 disclosure (data through 6 August 2025, posted November 2025) reports an average invoiced cost of $9,605.06 for new single-family electric service under Rule 16 — new service, not an upgrade of an existing one, and not including Rule 15 distribution extensions. It is here so the allowance and the average invoice are not confused with each other, and so a “PG&E panel upgrade cost” search result that reprints the new-service average as an upgrade price can be marked as the wrong row.

Con Edison — company portion, Company Plan accepted$0.00
Customer-side work is still the electrician’s bill
Dominion Energy Virginia — inadequate overhead replaced$0.00
XXII.F; previously served residence, not a UDA
Austin Energy — overhead 200 A, ≤75 ft$400.00
CIAC; no design required
Austin Energy — underground 200 A, ≤150 ft$800.00
CIAC; no design required
Seattle City Light — 0–200 A overhead, 1-phase$1,436.00
DPP 500 standard charge
Seattle City Light — 0–200 A underground, 1-phase$5,273.00
DPP 500 standard charge

Published customer charges at five named utilities for service facilities. These are those utilities’ figures, retrieved 5 September 2026. They are not a US average, not a sample, and not the electrician’s bill. Do not average the bars.

Five utilities, their own numbers

UtilityWhat the figure isAmountWhat it is not
Austin EnergyResidential overhead 200 A CIAC, ≤75 ft of service wire$400.00Not an electrician’s price; not a 400 A job
Austin EnergyResidential underground 200 A CIAC, ≤150 ft$800.00Not a national underground average
Seattle City LightStandard 0–200 A overhead single-phase service charge (DPP 500)$1,436.00Amp fee is extra if requested amps exceed the credit
Seattle City LightStandard 0–200 A underground single-phase service charge$5,273.00A rewire with no size increase is listed at $0 amp fee
Con EdisonCompany-owned portion of a service upgrade if the customer accepts the Company Plan$0.00Customer-side conduit, riser and panel remain the electrician’s invoice
Dominion Energy VirginiaReplacement of inadequate overhead facilities on a previously served residence (XXII.F.1.b)$0.00Not a $0 electrician; UG has trenching and route exceptions
PG&ERule 15/16 residential allowance, applied to service facilities first$3,255.00 per meterNot the invoice. Costs above the allowance are the applicant’s
PG&ESB 1210 average invoiced cost, new single-family Rule 16 electric service$9,605.06New service, not an upgrade; excludes Rule 15 mainline extensions

Quoted from each utility’s tariff, CIAC schedule, interconnection guide, terms and conditions or SB 1210 disclosure, retrieved 5 September 2026.

A sixth utility would not make this a national table. ELE-66 remains unpublished. Do not average these rows. Con Edison at $0 and Seattle City Light underground at $5,273.00 are not two ends of one fee. They are two utilities’ rules.

Named permit examples

Permit fees are municipal, or in parts of Washington they are the Department of Labor & Industries’ electrical program. They are not a percentage of the electrician’s bid unless that city writes them that way. They are also not “typically $X nationally.” Eight 2026 schedules, for a roughly comparable residential 200 A service or panel job, are on this page because we retrieved them. A ninth jurisdiction would not make a national fee. ELE-65, the city-by-city permit study, is not published.

The schedules do not even price the same object. New York City prices a service switch, a service-entrance set and a panel as three line items plus a filing fee. Houston prices a meter loop by kilowatts plus an administrative fee. Seattle prices a new or altered service by ampere band plus an administrative fee, and prices a mast-and-meter-base-only repair as a different specialty line. Portland prices a 200 A service or feeder as one number, and a reconnect-only as another. Washington L&I prices an altered 0–200 A service or feeder, including circuits, as one inspection fee, and a meter/mast repair as another. Oklahoma City prints a base fee for a 240-volt single-phase service up to 200 A, plus inspection lines, and a separate residential service-change line up to 200 A. San Francisco’s Category 1 residential table folds a 200 A service upgrade into a band that also covers up to 40 outlets. Los Angeles County prices an issuing fee plus a per-service-or-panelboard fee by ampere and voltage band. Adding those eight methods together and dividing by eight is not a typical permit. It is a category error.

Eight named fee schedules, 2026

LA County — issuing + one ≤399 A service/panelboard$99.70
2026–27 Title 27 schedule, effective 1 July 2026
Houston — meter loop ≤50 kW + admin$127.56
2026 CE-1057
Washington L&I — altered 0–200 A including circuits$109.90
F500-133-000, 1 July 2026
NYC — HYRE sum of 200 A switch + mid-size entrance + large 1-phase panel + filing$152.50
1 RCNY §101-03 line items
Portland — 200 A service or feeder$212.00
Effective 10 July 2026
Oklahoma City — 200 A base + rough + final$275.00
Title 18, 1 July 2026
Seattle — 150–200 A service + admin$347.48
2026 Fee Subtitle Table D-15
San Francisco — Category 1, ≤40 outlets including 200 A upgrade$580.00
Table 1A-E, 12 July 2026
JurisdictionPublished line items usedHYRE sum of those linesSource
New York City1 RCNY §101-03: $40.00 initial application + $30.00 service switch (101–200 A) + $45.00 service-entrance set (over 1/0 to 250 MCM) + $37.50 one-phase panel over 20/10 poles$152.50NYC DOB, 1 RCNY §101-03, retrieved 5 September 2026
HoustonMeter loop & service ≤50 kW $94.00 + administrative fee $33.56. Minimum permit $91.06$127.56Houston Permitting Center CE-1057 / HPWCODE1055, 2026 schedule
SeattleNew or altered electrical service, 150–200 A, $292.00 + administrative fee $55.48 (Table D-15, plans not required)$347.48SDCI 2026 Fee Subtitle, SMC 22.900D.150
City of Portland, OregonServices or feeders, installation, alteration or relocation, 200 A, $212.00. Reconnect only is a different line at $190.00$212.00Portland Permitting & Development, Electrical Permit Fee Schedule, effective 10 July 2026
Washington L&I (areas where L&I inspects)Altered service or feeder, 0–200 A, including circuits, $109.90. Meter/mast repair or replacement $59.40. New 0–200 A service in the multifamily/miscellaneous block is $129.40$109.90L&I form F500-133-000, fees effective 1 July 2026
Oklahoma CityBase fee, 240-volt single-phase service up to 200 A, $175.00, plus rough inspection $50.00 and final inspection $50.00. A separate “residential service change — up to 200 A” line prints $100.00$275.00Oklahoma City Code of Ordinances, Title 18, fees effective 1 July 2026
San FranciscoTable 1A-E Category 1, residential buildings up to 10,000 sq ft: up to 40 outlets and/or devices, includes up to 200 A service upgrade (up to 3 inspections), $580.00$580.00SF DBI Table 1A-E, permits issued on or after 12 July 2026
Unincorporated Los Angeles CountyIssuing fee $41.35 + one service, switchboard, motor-control centre or panelboard of 600 V or less and not over 399 A, $58.35. A 400–1,000 A band is $114.29 plus the same issuing fee$99.70LA County Public Works, 2026–27 Electrical Code Fee Schedule, effective 1 July 2026

HYRE added the published line items where more than one line is required to describe a 200 A residential service or panel job. The NYC conductor-size line assumes a 200 A entrance in the “over 1/0 to 250 MCM” band — typical for 4/0 aluminium — and is labelled as that assumption. Seattle’s 2026 subtitle also sets a $105.12 minimum for a standard OTC electrical permit, $146.00 for services up to 125 A, and $146.00 for a service repair of mast and meter base only; with the administrative fee that mast line is $201.48. Portland’s first branch circuit without a service-or-feeder purchase is $174.00; with a service-or-feeder purchase, branch circuits are $21.00 each. San Francisco’s $305.00 band is “up to 10 outlets and/or devices (1 inspection)” and is not a 200 A upgrade.

As of 29 June 2026, NYC DOB collects 50% of the electrical permit total at filing, not less than $130, with the remainder before inspection. A proposed amendment published in the City Record on 21 August 2026 would fold the $40 filing fee into the parts total and drop the old $5,000 cap; it was a proposal on retrieval, not a live rule. Do not budget the proposal. Oklahoma City’s $275.00 HYRE sum assumes both the rough and the final inspection lines print on the same 200 A base-fee job; the ordinance also prints a $100.00 residential service-change line. Those are two named lines, not two observations of one fee. Los Angeles County’s $99.70 is issuing plus one ≤399 A service-or-panelboard; a job that the county bills as a service and a panelboard would add a second $58.35.

Worked illustrations, from sourced unit inputs

The worked illustrations below are HYRE calculations: published unit prices added under stated assumptions. They are not measured job costs, not quotes, and not a range you should expect. The point of writing them down is to show which ledger each line belongs to.

Three hour-counts — 8, 16 and 24 electrician-hours — are run at the May 2025 OEWS median of $30.38/hour. That product is wages, not a billed rate. A contractor’s invoice for the same hours is higher by payroll burden, overhead and profit, which we do not estimate because we have no sourced national multiplier. Hardware is a Home Depot advertised price for named Square D, Eaton and Southwire SKUs, not a contractor’s distributor net. Permit lines are the named 2026 schedules above. Utility lines are the named tariffs above. Change any one of those and the arithmetic moves; none of the movement is a national average.

Illustration A is the interior-only job: same ampacity, accessible indoor panel, no mast, no meter-main, no aluminium-branch or FPE extra, Houston permit lines, and a utility that is pulling the meter but not resizing the service. Illustration B is the 100 A-to-200 A overhead service change, with a meter-main SKU, a 20-foot SER hardware line at the advertised per-foot price, Seattle permit lines, and the utility charge shown twice — once as Austin Energy’s overhead 200 A CIAC and once as Seattle City Light’s overhead standard charge — so those two tariffs are not blended. Illustration C is the same service change with the extras written down as extras: a Federal Pacific replacement is still a load-centre swap until the service is also changing, and aluminium branch remediation is a different commercial page. C is not priced as a sum, because we do not have sourced COPALUM, AlumiConn or whole-house-rewire unit prices we will defend as job cost. C exists so a bid that is silent on those extras can be marked incomplete.

Illustration A — interior-only 200 A like-for-like swap

LineFigureWhat it isWhich bill
Load centre (HOM4080M200PC, 200 A, 40-space)$268.21Home Depot advertised price, retrieved 5 September 2026. Not the contractor’s cost.Electrician
Permit, Houston meter-loop + admin$127.56City of Houston 2026 electrical fee schedule. Another city is another number.Electrician (pass-through)
Electrician wages, 8 hours at OEWS median$243.04HYRE: 8 × $30.38. Wages, not billed labour.Electrician
Electrician wages, 16 hours at OEWS median$486.08HYRE: 16 × $30.38.Electrician
Utility service charge, same-size rewireOften $0 on the utility sideSeattle City Light lists $0 amp fee when service size does not increase. Dominion Virginia replaces inadequate overhead at $0 company-side. The utility may still pull the meter. Ask.Utility

Interior-only, same ampacity, accessible indoor panel, Houston permit lines. Change the city and the permit line moves; change the hours and the wage line moves; neither movement is a national average.

Missing from this illustration on purpose: billed-rate markup, breakers, making-good, a meter-main, a mast, aluminium or FPE extras, and any utility CIAC. A bid that only contains the first two rows is not this job. Type the missing lines into the electrical project cost tool rather than filling them from this table.

Illustration B — 100 A to 200 A, utility involved, overhead

LineFigureWhat it isWhich bill
Meter-main combination (SC2040M200C)$324.12Home Depot advertised outdoor Homeline CSED, retrieved 5 September 2026. Indoor HOM4080M200PC is the wrong SKU if 230.85 applies.Electrician
SER hardware, 20 ft at advertised $7.83/ft$156.60HYRE: 20 × $7.83 from Southwire 250 ft 4/0-4/0-4/0-2/0 AL SER (13107808) at $1,957.08 / 250 ft. Retail coil maths, not installed conductor, not a 20 ft cut price.Electrician
Same SER hardware, 40 ft$313.20HYRE: 40 × $7.83. Distance is the variable. The SKU does not change.Electrician
Permit, Seattle 150–200 A service + admin$347.48SDCI 2026 Fee Subtitle Table D-15. Portland’s 200 A service-or-feeder line is $212.00; L&I’s altered 0–200 A is $109.90.Electrician (pass-through)
Electrician wages, 16 hours at OEWS median$486.08HYRE. Service-entrance, mast and meter-socket labour is in the hour count, not in a separate material line we could not source as installed cost.Electrician
Electrician wages, 24 hours at OEWS median$729.12HYRE, if the run is through finished work or the panel moves.Electrician
Austin Energy overhead 200 A CIAC$400.00Austin Energy’s charge, if this house is in Austin Energy territory and the design is not required.Utility
Seattle City Light 0–200 A overhead standard charge$1,436.00Seattle City Light’s charge, if this house is in SCL territory. Do not average with Austin.Utility
Dominion Energy Virginia, inadequate overhead replaced$0.00XXII.F.1.b, if this house is a previously served Dominion Virginia residence and the facilities are inadequate overhead. Not a $0 electrician.Utility

The utility line is the one competing pages bury inside “panel upgrade cost.” On this illustration it is either $400.00, or $1,436.00, or $0.00, depending on which named utility you are actually served by — and $5,273.00 if Seattle City Light is putting the service underground.

PG&E’s Rule 15/16 allowance ($3,255.00 per meter) may cover some or all of PG&E’s service facilities on a qualifying residential job; costs above the allowance are the applicant’s. That is a fourth rule, not a fourth average. Con Edison’s company portion is $0 if you accept the Company Plan; the electrician’s bill, the NYC permit and the customer-side entrance are still not $0.

Illustration C — when FPE or aluminium is in the house

Federal Pacific / Zinsco is on the electrician’s bill

Replacement of Stab-Lok equipment is a load-centre swap, often at the same ampacity. CPSC closed its FPE investigation in 1983 without a recall and without a safety determination; that is not a finding that the equipment is safe. Insurers and inspectors treat FPE (and Zinsco) as a replacement conversation regardless. If the service is also undersized, you have two jobs on one permit: the hazard-era product and the ampacity change. Cost the product decision on Federal Pacific replacement. Do not let a bid fold it into “panel upgrade” without naming it.

Aluminium branch wiring is a different invoice

CPSC Publication 516 names three permanent methods for solid aluminium branch-circuit wiring: copper rewire, COPALUM, AlumiConn. The last two leave the aluminium in the walls. A new panel does not remediate the connections in the rooms. Citizens Property Insurance (Florida residual market, FAQ updated 16 April 2026) will accept documented COPALUM or AlumiConn, or a full copper rewire — that is one named carrier, not a national rule. Cost that conversation on aluminum wiring remediation, not as a silent adder here.

What the illustrations are for

Use them to read a bid

If a written estimate has one lump sum called “panel upgrade,” ask it to split: load centre, customer-side labour, permit, utility/CIAC, extras. Put those lines through the electrical project cost tool — it adds the figures you type and refuses to invent a national panel average.

Do not use them as your price

Eight hours in an unfinished garage is not 24 hours through plaster and a meter-main. Houston is not Seattle. Austin Energy is not Con Edison. A HYRE sum of sourced unit inputs is arithmetic, not a market.

Panel hardware, as advertised

ItemAdvertised priceSource
Square D Homeline 200 A, 40-space, 80-circuit indoor main-breaker load centre (HOM4080M200PC)$268.21The Home Depot product listing, retrieved 5 September 2026
Square D Homeline 200 A, 30-space, 60-circuit indoor main-breaker value pack (HOM3060M200PCVP)$214.00The Home Depot category listing, retrieved 5 September 2026
Square D Homeline 200 A, 20-space, 40-circuit indoor main-breaker load centre (HOM2040M200PC)$164.86The Home Depot category listing, retrieved 5 September 2026
Square D Homeline 200 A, 20-space, 40-circuit outdoor ring-type overhead/underground main-breaker CSED (SC2040M200C)$324.12The Home Depot product listing, retrieved 5 September 2026. Meter-main combination, not an indoor panel.
Eaton BR 200 A, 40-space / 80-circuit indoor main-breaker load centre contractor kit (BRP40B200V25)$294.26The Home Depot category listing, retrieved 5 September 2026
Square D QO 200 A, 42-space indoor main-breaker value pack (QO42M200PCVP)$425.19The Home Depot category listing, retrieved 5 September 2026. Copper-bus QO family, not Homeline.
Southwire 250 ft 4/0-4/0-4/0-2/0 gray stranded AL SER (13107808)$1,957.08 ($7.83/ft)The Home Depot product listing, retrieved 5 September 2026. Retail coil. Local store prices may vary. Not installed cost.
Southwire by-the-foot 4/0-4/0-4/0-2/0 gray stranded AL SER (13107899)$8.30/ftThe Home Depot category listing, retrieved 5 September 2026. A different unit price from the 250 ft coil. Do not mix them in one line.

Retail advertised prices, not contractor net from a distributor, and not installed cost. A meter-main combination, a NEMA 3R outdoor enclosure, copper bus, or a different manufacturer is a different SKU. Breakers beyond any value-pack contents, the grounding electrode system, and making-good are not in these numbers.

Hardware is usually the small line. Labour, access, the utility and the extras move the invoice. A bid that is mostly the load-centre SKU is either incomplete or not a service upgrade. The indoor Homeline 40-space at $268.21 and the outdoor meter-main at $324.12 are not two prices for one box; they are two jobs. The QO value pack at $425.19 is a different family again. Local store prices may vary from the advertised figures retrieved 5 September 2026.

What a quote has to itemise — and why a lump sum is not comparable

Two written estimates that each say “200 amp panel upgrade” are not two observations of one price. They are comparable only after the same lines have been named on both. The checklist below is the split this page uses: which of the four jobs, the load calculation, the spaces, the permit, the utility, the meter-main, the extras, the licence. A bid that refuses the split is not cheaper. It is unread.

The permit line is the one a lump sum most often swallows. In the eight schedules on this page it runs from a Los Angeles County issuing-plus-one-panelboard HYRE sum of $99.70 to a San Francisco Category-1 line of $580.00. That is not “permits typically $X.” It is eight named authorities pricing eight objects. $0.00 on a bid does not mean the work is exempt. It means the fee is somewhere else, or it has not been pulled.

The utility line is the one a lump sum most often hides. In the five tariffs on this page it runs from $0.00 (Con Edison company portion with Company Plan; Dominion Virginia inadequate-overhead replacement) through $400.00 (Austin Energy overhead 200 A) to $5,273.00 (Seattle City Light underground 0–200 A). PG&E’s $3,255.00 residential allowance is not a charge; it is a cap on what PG&E will put on its own side before the applicant pays the excess. A bid that is silent on the utility is not a complete price for a service upgrade. Ask which utility, which tariff, who owns the mast, who pulls the meter, who reconnects, and whether a contribution is due.

The extras line is the one that turns a cheap panel into a second invoice. Federal Pacific, Zinsco, aluminium branch terminations, grounding-electrode upgrades, AFCI/GFCI as the adopted code requires them, and making-good of drywall are either in the scope or they are a change order. Unwritten extras are how a “cheap panel” becomes a second invoice. Type the lines you were given into the project-cost tool rather than averaging two unlike lumps.

Quote itemisation checklist

  • Which of the four jobs is this?

    Like-for-like panel, ampacity change, meter-main / emergency disconnect, or subpanel. If the bid does not say, it is not comparable to another bid.

  • Load calculation, not a vibe

    Ask for the calculation the permit will be pulled on, in the adopted NEC edition. The load calculator on this site is a conversation in the shape of 220.82, not a stamp.

  • Spaces counted, not guessed

    Spare slots, tandems already used, double-taps. A full 200 A panel does not take an EV breaker. Use the panel space checker.

  • Permit line, named

    Which department, which fee, who pulls it, who meets the inspector. $0 on a bid does not mean the work is exempt. The eight schedules on this page are examples, not your city.

  • Utility line, named

    Which utility, which tariff or CIAC schedule, who owns the mast, who pulls the meter, who reconnects, and whether a contribution is due. This is the line that surprises people.

  • Meter-main and 230.85

    If the service is being resized, ask whether the adopted code requires an outdoor emergency disconnect, and whether that is a meter-main SKU or a separate enclosure. The indoor Homeline and the outdoor CSED are different advertised prices because they are different equipment.

  • Extras written down

    Aluminium branch terminations, Federal Pacific or Zinsco replacement, grounding electrode upgrades, AFCI/GFCI as required, making-good of drywall. Unwritten extras are how a “cheap panel” becomes a second invoice. See Federal Pacific replacement and aluminum wiring remediation.

  • Licence, in the jurisdiction

    The person pulling the permit should be licensable there. Look the number up; this site’s licence lookup is for that, not for a ranking.

  • Do not average two bids

    If they are $3,000 apart they are usually not pricing the same lines. Itemise both against this checklist before deciding anyone is expensive.

  • Do not DIY the service

    Meter, mast, service conductors and the load centre are licensed work. This page will not tell you how to land a SER cable.

Federal Pacific, aluminium, and other extras that are not “the panel”

Federal Pacific Stab-Lok equipment was the subject of a two-year CPSC investigation that closed in 1983 without a recall. The Commission’s 3 March 1983 release (83-008) said the data then available did not establish that the breakers posed a serious risk of injury, and that staff lacked the data to accept or refute the manufacturer’s position. A 18 February 2011 staff note on the same release added that the Commission closed the matter “without making a determination as to the safety of FPE circuit breakers or the accuracy of the manufacturer’s position on the matter.” That is not a finding that the equipment is safe, and it is not a recall. Insurers and inspectors treat FPE (and Zinsco) as a replacement conversation regardless.

When FPE is in the house, it changes the electrician’s bill in one of two ways. If the service ampacity is staying, the job is a like-for-like load-centre replacement: Illustration A’s shape, with the extra of landing every branch on a listed bus and throwing away the Stab-Lok breakers. Aftermarket Stab-Lok-type breakers are not the job. If the service is also being resized, you have Illustration B plus the FPE extra: the hazard-era product and the ampacity change on one permit, two reasons, one set of service-entrance labour. A bid that prices only the new 200 A box, on a house whose existing panel is Stab-Lok, has not said which of those two it is. Replacement of that equipment is its own commercial page; cost the product decision on Federal Pacific replacement, not as a silent adder on this one. Do not DIY it. Do not remove the dead-front to “be sure.”

Aluminium branch wiring is a CPSC-recognised residential issue with two accepted repair methods (COPALUM and AlumiConn) and a full-rewire alternative. CPSC Publication 516, Repairing Aluminum Wiring, June 2011, still the current numbered pamphlet when we retrieved it, ranks complete copper replacement first, COPALUM second, and AlumiConn third and conditional on COPALUM being unavailable locally. Twist-on connectors and CO/ALR devices are not, in CPSC’s published view, a permanent repair. CPSC is explicit that those repairs do not apply to larger-gauge aluminium used for service-entrance cable, dryers and ranges — so the 4/0 aluminium SER in Illustration B is not this problem. The problem is the solid #12 and #10 aluminium on the 15- and 20-ampere general-purpose circuits.

A panel upgrade on an aluminium-wired house that does not say what happens to the branch terminations is not a complete scope. The new load centre’s lugs can be listed for aluminium. That listing does not remediate the receptacle, switch, fixture and junction connections in the rooms. Under COPALUM and AlumiConn the original aluminium stays in the walls; only a copper rewire removes it. That distinction is what a carrier is asking about when it underwrites the house. Citizens Property Insurance — Florida’s residual market — will accept documented COPALUM or AlumiConn at every aluminium-to-copper connection, or a full copper rewire (FAQ updated 16 April 2026). That is one named carrier’s rule, not a national fact. Ask your own insurer which of the three methods it will accept, in writing, before you pay for one. Whole-house rewiring is a different commercial page; the aluminium-specific decision lives at aluminum wiring remediation.

An EV circuit is also a different job, with its own distance-and-capacity drivers. If the panel work exists to land a charger, read it against EV charger installation cost and EV charger installation rather than padding this invoice with a charger SKU. Spare amps and spare spaces fail independently; a 32 A charger is a 40 A-class continuous load and a 48 A charger is a 60 A-class load. If leftover covers that figure and two spaces exist, the job may be a circuit. If it does not, a service change is one path and energy management under NEC 625.42 is another.

The federal tax credit that competing pages still advertise has expired

The Energy Efficient Home Improvement Credit (IRC §25C) paid 30% of qualifying panelboard, sub-panelboard, branch-circuit and feeder costs, capped at $600, when those improvements enabled other qualifying energy property and both were installed in a year the credit was in force. IRS instructions for Form 5695 (2025) and ENERGY STAR’s panel-upgrade credit page state the credit applies to products purchased and installed through 31 December 2025. ENERGY STAR’s page described the enabling property as NEC-consistent 200 A-or-greater.

This page is published in September 2026. Work placed in service in 2026 is not a 2025 25C claim. Do not subtract $600 from a current bid because a 2024 article said you could. Confirm current law with the IRS or a tax professional; this is not tax advice.

Method and limitations

  • Two ledgers, never one range

    Every dollar figure on this page is either a published unit price (wage, SKU, permit line, utility tariff) or a HYRE sum of those unit prices under a stated assumption. No figure is a measured national job cost.

  • Wages are not billed rates

    OEWS SOC 47-2111, May 2025, released 15 May 2026. Median $30.38/hour, $63,190.00/year; 10th–90th $42,640.00–$108,510.00; 25th–75th $49,430.00–$83,940.00. OEWS employment 757,220 wage-and-salary electricians; the Occupational Outlook Handbook’s 821,000 jobs figure for 2025 includes self-employed workers (7%), who are out of OEWS. Electrical-contractor industry median $61,570.00/year; government $79,820.00; manufacturing $74,550.00. Named state and metro medians are O*NET republications of the same May 2025 OEWS estimates. None of these is what you are billed.

  • Permits are eight named schedules

    NYC 1 RCNY §101-03; Houston Permitting Center 2026 electrical schedule; Seattle SDCI 2026 Fee Subtitle; Portland Electrical Permit Fee Schedule effective 10 July 2026; Washington L&I F500-133-000 effective 1 July 2026; Oklahoma City Title 18 effective 1 July 2026; San Francisco Table 1A-E on or after 12 July 2026; Los Angeles County 2026–27 Electrical Code Fee Schedule effective 1 July 2026. A ninth jurisdiction would not make a national fee. ELE-65, the city-by-city permit study, is not published.

  • Utilities are five named tariffs

    Austin Energy CIAC page (reviewed 26 February 2026), Seattle City Light DPP 500 (effective 25 June 2025), Con Edison interconnection guide (2026 edition), Dominion Energy Virginia Terms and Conditions XXII (effective 1 January 2026), PG&E Electric Rules 15 and 16 plus the SB 1210 new-service disclosure. ELE-66 is CHECK-blocked; there is no synthesised US utility-fee table here.

  • Hardware is retail advertised

    Home Depot listings retrieved 5 September 2026. Contractor net from a distributor is different and unpublished here. Local store prices may vary.

  • Hour counts are assumptions

    8 / 16 / 24 hours are planning placeholders so the wage arithmetic is visible at three values, not a time-and-motion study.

  • No ELE-09 findings

    The research study that would measure completed residential panel and service jobs nationally is planned, not written. This page does not preview its conclusions and does not invent a national job-cost sample.

  • Not a quote, not DIY, not tax advice

    HyreElectrical does not perform electrical work and does not quote jobs. Service work is licensed. 25C status is as IRS published it; confirm before filing.

Questions

How much does an electrical panel upgrade cost?
There is no honest national figure, and this page does not ship one. You will typically see two invoices: the electrician’s (load centre, customer-side labour, permit, extras) and the utility’s (service drop or lateral, meter, any contribution). Unit inputs we can source: a May 2025 OEWS median electrician wage of $30.38/hour; a Home Depot-advertised 200 A 40-space Homeline panel at $268.21 and an outdoor Homeline meter-main at $324.12; 2026 permit line-item sums from $99.70 (Los Angeles County, issuing + one ≤399 A service/panelboard) and $127.56 (Houston meter-loop + admin) through $347.48 (Seattle 150–200 A service + admin) to $580.00 (San Francisco Category 1 including a 200 A upgrade); and named utility charges from $0 (Con Edison company portion if you accept the Company Plan; Dominion Virginia inadequate-overhead replacement) through $400.00 (Austin Energy overhead 200 A) to $5,273.00 (Seattle City Light underground 0–200 A). Type a written bid into the electrical project cost tool rather than averaging those rows.
What is the difference between a panel replacement and a service upgrade?
A panel replacement swaps the load centre, often at the same ampacity. A service upgrade resizes the incoming service — commonly 100 A to 200 A — and the utility is a party to the meter, the drop or lateral, and sometimes the transformer. Competing pages call both a “panel upgrade.” They are different jobs, and they produce different second bills. The decision rule is on the panel-upgrade service page; the money conversation is this one.
Who pays the utility to upgrade the service?
It depends on the tariff, not on custom. Con Edison’s 2026 interconnection guide says the company portion is $0 if you accept the Company Plan. Dominion Energy Virginia’s Terms and Conditions XXII.F, effective 1 January 2026, says the company will replace inadequate overhead facilities on a previously served residence at no cost to the customer. Austin Energy publishes a $400 overhead / $800 underground CIAC for a standard 200 A residential service that does not need a design. Seattle City Light’s DPP 500 lists $1,436 overhead and $5,273 underground for 0–200 A single-phase. PG&E applies a Rule 15/16 residential allowance of $3,255 per meter to service facilities first; the applicant pays the excess. Ask your utility which rule you are under. Do not average these five.
How much is the permit for a 200 amp panel?
In the 2026 schedules on this page: Los Angeles County’s issuing fee plus one ≤399 A service/panelboard is $99.70; Houston’s meter-loop ≤50 kW fee plus administrative fee is $127.56; Washington L&I’s altered 0–200 A service or feeder, including circuits, is $109.90 where L&I inspects; New York City’s 1 RCNY §101-03 lines for a 101–200 A service switch, a mid-size service-entrance set, a large one-phase panel and the $40 filing fee sum to $152.50 under HYRE’s stated conductor-size assumption; Portland’s 200 A service-or-feeder line is $212.00; Oklahoma City’s 200 A base fee plus rough and final inspections sums to $275.00, and a separate residential service-change line prints $100.00; Seattle’s 150–200 A service fee plus administrative fee is $347.48; San Francisco’s Category 1 band that includes a 200 A upgrade with up to 40 outlets is $580.00. Another city is another schedule.
Do I need a 200 amp panel for an EV charger?
Not always. What decides it is spare ampacity and spare spaces, not the charger’s brand. Run a load calculation against the adopted NEC edition and count spaces. The load calculator and panel-space checker on this site are for that conversation. If the constraint is a long run from panel to parking, that is an EV-circuit cost, not a panel-upgrade cost — see EV charger installation cost.
Is there still a federal tax credit for a panel upgrade?
The §25C Energy Efficient Home Improvement Credit covered qualifying panelboards, sub-panels, branch circuits and feeders at 30% up to $600 when they enabled other qualifying energy property, through 31 December 2025. IRS Form 5695 (2025) and ENERGY STAR state that end date. Work placed in service in 2026 is not a 2025 25C claim. This is not tax advice; confirm with the IRS or a tax professional.
Does a Federal Pacific panel have to be replaced as a service upgrade?
Replacement of Federal Pacific Stab-Lok equipment is a safety and insurance conversation, not automatically a service-size conversation. CPSC closed its FPE investigation in 1983 without issuing a recall and, in a 2011 staff note, without making a determination as to safety; that is not a clean bill of health. You can replace the panel at the same ampacity. If the service is also undersized, you have two jobs. See Federal Pacific replacement. Do not DIY it.
Does a new panel fix aluminium branch wiring?
No. CPSC Publication 516’s three permanent methods — copper rewire, COPALUM, AlumiConn — are about the connections in the rooms, not about the bus in the garage. A new panel listed for aluminium at its lugs does not remediate those connections. Cost that work on the aluminum wiring remediation page, and ask the insurer in writing which method it will accept. HyreElectrical does not perform electrical work.
Can I replace a panel myself?
No. Service conductors, the meter, the mast and the load centre are licensed work in almost every US jurisdiction. This page will not instruct it. HyreElectrical does not perform electrical work.
Why will you not give me an average price?
Because an average pretends an interior-only 200 A swap in an unfinished garage is the same job as a 100 A-to-200 A underground service change that waits on the utility. Labour medians, permit schedules and utility tariffs we can source already move by a factor of two or more before anyone opens a wall. A single national range would hide the two bills this page exists to separate.

Written and audited by

HyreElectrical Research Desk

Primary-source research and fact checking

We read the model code, the federal safety notice, the municipal fee sheet or the utility tariff ourselves, and we publish the figure with the document it came from and the date we retrieved it. Where a number cannot be traced to a primary source, we publish the shorter page and say what we could not verify. HyreElectrical does not perform, supervise or warrant electrical work. Authorship is organisational: this desk, not a named persona.

10
long-form launch pages in this layout
5
states with verified licence records
16,369
electrical companies in those records
74%
of the store is Florida — disclosed first, not footnoted

How this desk works

  • Primary sources only. Code statements come from NFPA 70 as the model code. Safety statements come from CPSC. Permit fees come from the city or county fee sheet. Utility charges come from the filed tariff. We do not cite a blog that cites a source; we open the source.
  • Our contractor store is five states, and 74% of it is Florida. Any figure built on that store is titled to those states and names the concentration in the first screen. It is not a national sample of electricians.
  • Load calculations on this site are a published simplification in the shape of NEC 220.82 — first 10 kVA at 100%, remainder at 40%, HVAC at 100%, EVSE at 125%. They are labelled as not a stamped calculation. A licensed electrician using the adopted edition does that work.
  • No national price for a panel upgrade is shipped. Labour rates, the adopted code edition, whether the utility is involved, and the state of the existing wiring move the invoice too far for a roundup to help. Cost intent lives on the cost page; this page explains the decision.
  • We do not perform electrical work, and we take no payment for placement, ranking or a favourable mention. Nobody buys a position on this site.

Data as of 5 September 2026. Authorship on this site is organisational: the analysis belongs to the desk rather than to a named individual, and we do not publish credentials we do not hold. Our editorial policy sets out how we source, date and correct what we publish.

Sources & retrieval dates

  1. BLS Occupational Outlook Handbook — Electricians , May 2025 median pay $63,190.00 / $30.38 per hour; 10th–90th $42,640.00–$108,510.00; electrical-contractors industry median $61,570.00; government $79,820.00; manufacturing $74,550.00; employment services $57,760.00; 821,000 jobs in 2025 (includes self-employed, 7%); 66% of employment in electrical contractors. Last modified 27 August 2026. Retrieved 5 September 2026.
  2. BLS Occupational Employment and Wages — May 2025 news release (USDL-26-0725) , Electricians among the largest construction occupations at 757,220 wage-and-salary jobs. Released 15 May 2026. OEWS excludes self-employed workers. Retrieved 5 September 2026.
  3. O*NET OnLine — Local wages, 47-2111 Electricians (BLS OEWS May 2025) , Republication of May 2025 OEWS. US 25th/75th $49,430.00 / $83,940.00. Illinois median $99,560.00 / $47.87 per hour; Washington $95,220.00 / $45.78; New York $78,750.00 / $37.86; Chicago-Naperville-Elgin $102,350.00 / $49.21; Seattle-Tacoma-Bellevue $101,780.00; Portland-Vancouver-Hillsboro $105,090.00; Denver-Aurora-Centennial $63,150.00 / $30.36. Retrieved 5 September 2026.
  4. The Home Depot — Square D Homeline HOM4080M200PC , Advertised $268.21 for the 200 A, 40-space, 80-circuit indoor main-breaker load centre. Retail advertised price, not contractor net. Local store prices may vary. Retrieved 5 September 2026.
  5. The Home Depot — Square D Homeline 200 A load centres , Advertised $214.00 for HOM3060M200PCVP (200 A, 30-space value pack) and $164.86 for HOM2040M200PC (200 A, 20-space) on Homeline category listings. Retrieved 5 September 2026.
  6. The Home Depot — Square D Homeline SC2040M200C outdoor meter-main , Advertised $324.12 for the 200 A, 20-space, 40-circuit outdoor ring-type overhead/underground main-breaker CSED. Meter-main combination, not an indoor panel. Retrieved 5 September 2026.
  7. The Home Depot — Eaton BRP40B200V25 and Square D QO42M200PCVP , Advertised $294.26 for the Eaton BR 200 A 40-space / 80-circuit indoor main-breaker contractor kit, and $425.19 for the Square D QO 200 A 42-space value pack, on category listings. Retrieved 5 September 2026.
  8. The Home Depot — Southwire 250 ft 4/0-4/0-4/0-2/0 AL SER (13107808) , Advertised $1,957.08 ($7.83/ft) for a 250-foot coil. By-the-foot listing for 13107899 advertised $8.30/ft. Retail advertised, not installed cost. Local store prices may vary. Retrieved 5 September 2026.
  9. NYC Department of Buildings — 1 RCNY §101-03, electrical permit fees , Initial application $40.00; service switch 0–100 A $8.00, 101–200 A $30.00, 201–600 A $105.00; one-phase panel up to 20/10 poles $15.00, over that $37.50; service-entrance cables in four conductor-size bands $15.00–$75.00. Retrieved 5 September 2026.
  10. NYC DOB — Electrical PAA fees construction advisory (2026-003) and DOB NOW fee change , From 29 June 2026, 50% of the electrical permit total is due at filing, minimum $130, remainder before inspection. Advisory dated 29 June 2026. Retrieved 5 September 2026.
  11. Houston Permitting Center — Electrical Meter & Loop Service Permit (HPWCODE1055) and 2026 CE-1057 , Meter loop & service ≤50 kW $94.00; administrative fee $33.56; minimum permit $91.06. 2026 CPI increase 1.3910% effective 1 January 2026. Retrieved 5 September 2026.
  12. Houston Permitting Center — 2026 fee increase notice , Administrative fee $33.56; minimum Building Code Enforcement permit $91.06. Retrieved 5 September 2026.
  13. Seattle Department of Construction & Inspections — 2026 Fee Subtitle, SMC 22.900D.150 Table D-15 , Administrative fee $55.48; OTC minimum $105.12; new or altered service up to 125 A $146.00, 150–200 A $292.00; service repair (mast and meter base only) $146.00. Retrieved 5 September 2026.
  14. City of Portland — Electrical Permit Fee Schedule, effective 10 July 2026 , Services or feeders, installation, alteration or relocation: 200 A $212.00; 201–400 A $298; reconnect only $190.00. Branch circuits with a service-or-feeder purchase $21.00; first branch circuit without that purchase $174.00. Retrieved 5 September 2026.
  15. Washington State Department of Labor & Industries — Residential electrical fee worksheet F500-133-000 , Fees effective 1 July 2026. Altered service or feeder 0–200 A including circuits $109.90. New service or largest feeder 0–200 A (multifamily/miscellaneous block) $129.40. Meter/mast repair or replacement $59.40. Inspection fees where L&I inspects; some cities add their own. Retrieved 5 September 2026.
  16. Oklahoma City Code of Ordinances — Title 18 Electrical Code, permit fees , Fees effective 1 July 2026 and thereafter. Base fee, 240-volt single-phase service up to 200 A, $175.00; plus each additional 100 A $50.00; rough inspection $50.00; final inspection $50.00. Residential service change up to 200 A $100.00. Retrieved 5 September 2026.
  17. City and County of San Francisco — Table 1A-E, Electrical Permit Issuance and Inspection , Fees apply to permits issued on and after 12 July 2026. Category 1, residential buildings up to 10,000 sq ft: up to 10 outlets $305.00; up to 40 outlets and/or devices, includes up to 200 A service upgrade (up to 3 inspections), $580.00. Retrieved 5 September 2026.
  18. Los Angeles County Public Works — 2026–27 Electrical Code Fee Schedule , Effective 1 July 2026, unincorporated territory. Issuing $41.35. Services, switchboards, motor-control centres and panelboards, 600 V or less and not over 399 A, $58.35; 400 A to 1,000 A, $114.29. Title 27 of the County of Los Angeles Code. Retrieved 5 September 2026.
  19. Austin Energy — Meter & Service Wire Charges (CIAC) , Overhead 200 A ≤75 ft $400.00; underground 200 A ≤150 ft $800.00; overhead 320 A $400.00; underground 320 A $1,600.00; meter only up to 320 A $200.00. Last reviewed 26 February 2026. Retrieved 5 September 2026.
  20. Seattle City Light — DPP 500, Service Installations , Standard charges effective 25 June 2025: 0–200 A overhead single-phase $1,436.00; 0–200 A underground single-phase $5,273.00; amp fee $6.36/A with a 200 A credit on 120/240 V single-phase; $0 amp fee when service size does not increase. Retrieved 5 September 2026.
  21. Con Edison — Electric Vehicle Interconnection Guide , “Electric service is provided at no cost when the customer accepts Con Edison’s plan (Company Plan).” No cost to customers for the Con Edison portion of service upgrades or new service if they accept the Company Plan. Customer-side work remains the customer’s. 2026 edition. Retrieved 5 September 2026.
  22. Dominion Energy Virginia — Terms and Conditions, Section XXII, Electric Line Extensions and Installations , Filing effective 1 January 2026. XXII.F.1.b: the Company will replace inadequate overhead facilities with adequate overhead facilities at no cost to the Customer, for previously served individually metered permanent residences not in a designated Underground Distribution Area. Inadequate underground replaced at no cost except trenching-composition and off-Preferred-Route exceptions. “Inadequate” defined in XXII.A.1 as lacking capacity to serve the load at existing service characteristics. Retrieved 5 September 2026.
  23. PG&E Electric Rule 15 — Distribution Line Extensions, residential allowance , Residential allowance $3,255.00 per meter or dwelling unit, applied to service facilities first under Rule 16. Retrieved 5 September 2026.
  24. PG&E Electric Rule 16 — Service Extensions , Residential allowances determined under Rule 15; applied to service facilities first; excess to the distribution line extension. Mixed-fuel new-construction allowances removed. Retrieved 5 September 2026.
  25. PG&E — SB 1210 average project cost and timeline, Rule 16 electric , Average invoiced cost for new single-family residence (1 lot) $9,605.06. Applications from 1 January 2023; construction complete as of 6 August 2025. New service, not upgrades; excludes Rule 15 extensions. Retrieved 5 September 2026.
  26. IRS — Energy Efficient Home Improvement Credit and Instructions for Form 5695 (2025) , §25C credit for qualifying panelboards, sub-panelboards, branch circuits or feeders: 30% up to $600, as enabling property, through 31 December 2025. Form 5695 (2025) line 25. Not available for property placed in service after that date on the IRS pages retrieved. Retrieved 5 September 2026.
  27. ENERGY STAR — Electric Panel Upgrade Tax Credit , Credit effective for products purchased and installed between 1 January 2023 and 31 December 2025. 30% of project cost, $600 maximum, with NEC-consistent 200 A-or-greater enabling property. Retrieved 5 September 2026.
  28. CPSC — Commission Closes Investigation of FPE Circuit Breakers (1983; staff note 2011) , Investigation closed without a recall. Data then available did not establish that the breakers posed a serious risk of injury; staff lacked data to accept or refute the manufacturer’s position. 2011 staff note: closed without making a determination as to safety. Not a finding of safety. Retrieved 5 September 2026.
  29. CPSC Publication 516 — Repairing Aluminum Wiring (June 2011) , Three methods CPSC will treat as a permanent repair of solid aluminium branch-circuit wiring: complete copper replacement; COPALUM; AlumiConn if COPALUM is unavailable. Twist-on connectors and CO/ALR devices are not a permanent repair in CPSC’s published view. Does not apply to larger-gauge aluminium service-entrance, dryer or range conductors. Retrieved 5 September 2026.
  30. NFPA 70, National Electrical Code — Article 230 (services), including 230.85 emergency disconnects (2020 cycle) , Cited as the model code. Whether 230.85 applies is a question of the edition your jurisdiction adopted, plus local amendments. Not a price list. Retrieved 5 September 2026.

Get the two bills itemised

Ask every electrician for the same written split: panel, customer-side labour, permit, utility/CIAC, extras. Type those lines into the project-cost tool. Then decide whether you need a panel, a service change, or neither.

When a panel upgrade is actually needed Find a local electrician

HyreElectrical does not perform, supervise or warrant electrical work and does not quote jobs. Matching is still being built. Submitting an enquiry is not a booking. This page is general information, not a bid, not a load calculation, and not legal, tax or engineering advice. Live electrical work is licensed work.